Title (link to summary) | Number | Date (released or updated) |
Upper Naches River and Cowiche Creek Temperature Total Maximum Daily Load: Volume 2. Implementation Strategy
| 10-10-068 | December 2010 |
Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report and Implementation Plan
| 10-10-067 | December 2010 |
Streamflow Summary for Burnt Bridge Creek (Clark County), 2008
| 10-03-072 | December 2010 |
Streamflow Summary for the Palouse and South Fork Palouse Rivers and Selected Tributaries, 2006-08
| 10-03-071 | December 2010 |
Weaver Creek (Mason County) Fecal Coliform Attainment Monitoring
| 10-03-070 | December 2010 |
Addendum to Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment
| 08-03-119 Addendum 1 | December 2010 |
Selecting Mitigation Sites Using a Watershed Approach (Eastern Washington)
| 10-06-007 | November 2010 |
Quality Assurance Project Plan: Skagit Bay Fecal Coliform Bacteria Loading Assessment
| 10-03-121 | November 2010 |
POSTER: Washington’s Swimming Beach Program: Bacterial Monitoring in Puget Sound
| 10-03-065 | November 2010 |
Land-Use Effects on Export and Retention of Mercury in the Lake Ozette Watershed
| 10-03-059 | November 2010 |
Upper Chehalis River Watershed Multi-Parameter Total Maximum Daily Load: Water Quality Data Review
| 10-03-057 | November 2010 |
Quality Assurance Project Plan: Lake Spokane Nutrient Monitoring
| 10-03-120 | October 2010 |
Quality Assurance Project Plan: Mercury Screening in Lake Ozette Sockeye
| 10-03-118 | October 2010 |
Quality Assurance Project Plan: Trend Monitoring for Organic PBTs in Washington Rivers and Lakes
| 10-03-117 | October 2010 |
Measuring Mercury Trends in Freshwater Fish in Washington State, 2009 Sampling Results
| 10-03-058 | October 2010 |
2010 Report to the Legislature and Governor: Review of Water Resources Program Functions and Funding Structure--Recommendations for a Sustainable and Efficient Program
| 10-11-022 | September 2010 |
Public Hearings, Workshops, and Comment Period: Draft Aquatic Plant and Algae Management General Permit
| 10-10-056 | September 2010 |
Quality Assurance Project Plan: Hangman Hills Sewage Treatment Plant Nutrient Loading and Groundwater Study
| 10-03-116 | September 2010 |
Quality Assurance Project Plan: Analyzing Toxaphene at Water Quality Criteria Levels in Treated Lakes and Agricultural Streams
| 10-03-115 | September 2010 |
Quality Assurance Project Plan: Pilot Study of an Ambient Monitoring Approach for Evaluating the Biological Integrity of Urban Streams.
| 10-03-114 | September 2010 |
Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study
| 10-03-111 | September 2010 |
Quality Assurance Project Plan: Phase 2: High Summer Bacteria Concentrations in Streams
| 10-03-110 | September 2010 |
Walla Walla River Basin Fecal Coliform Bacteria, pH, and Dissolved Oxygen
Total Maximum Daily Load: Supplemental Study
| 10-03-054 | September 2010 |
Potholes Reservoir: Screening Survey for Dieldrin, Other Chlorinated Pesticides, and PCBs in Fish, Water, and Sediments
| 10-03-053 | September 2010 |
PCBs, Dioxins, and Furans in Fish, Sediment, and Wastewater Treatment Plant Effluent from West Medical Lake
| 10-03-038 | September 2010 |
Focus on the Clean Samish Initiative
| 09-10-020 | September 2010 |
Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design
| 10-03-113 | August 2010 |
Quality Assurance Monitoring Plan: Ambient Biological Monitoring in Rivers and Streams: Benthic Macroinvertebrates and Periphyton
| 10-03-109 | August 2010 |
River and Stream Water Quality Monitoring Report, Water Year 2009
| 10-03-046 | August 2010 |
Focus on Perfluorinated Compounds: PFCs in Washington State Rivers and Lakes
| 10-03-044 | August 2010 |
Skagit-Samish Basin Intensive Surface Water Sampling for Pesticides in Salmon-Bearing Streams, 2009
| 10-03-043 | August 2010 |
Perfluorinated Compounds in Washington Rivers and Lakes
| 10-03-034 | August 2010 |
Transforming Watersheds: Palouse River - Whitman County
| 10-10-039 | July 2010 |
Tucannon River and Pataha Creek Temperature Total Maximum Daily Load: Water Quality Improvement Report and Implementation Plan
| 10-10-019 | July 2010 |
Focus on Irrigation-Influenced Wetlands
| 10-06-015 | July 2010 |
Puget Sound Watershed Characterization - Introduction to the Water Flow Assessment for Puget Sound
| 10-06-014 | July 2010 |
Quality Assurance Project Plan: Monitoring Stream Temperatures and Habitat Characteristics for the Extensive Riparian Status and Trends Program
| 10-03-105 | July 2010 |
Lower White River Nutrients and pH Study: Data Summary Report
| 10-03-040 | July 2010 |
Water for Jobs and Fish: The Red Mountain AVA/Kiona Diversion Project
| 10-12-004 | June 2010 |
Quality Assurance Project Plan: Walla Walla Watershed Planning Area Prediction of Gaged Streamflows by Modeling
| 10-03-108 | June 2010 |
Quality Assurance Project Plan: Asotin Creek Fecal Coliform Study.
| 10-03-106 | June 2010 |
PBT Trend Monitoring: Measuring Lead in Suspended Particulate Matter from Washington State Rivers and Lakes, 2009 Results
| 10-03-041 | June 2010 |
Guidance for Stressor Identification of Biologically Impaired Aquatic Resources in Washington State
| 10-03-036 | June 2010 |
Determination of PBT Chemical Trends in Selected Washington Lakes Using Age-Dated Sediment Cores, 2009 Sampling Results
| 10-03-035 | June 2010 |
Green Shorelines for Lakes Washington and Sammamish
| 10-06-008 | May 2010 |
Mercury Accumulation in Sediment Cores from Three Washington State Lakes: Evidence for Local Deposition from a Coal-Fired Power Plant. Journal article in the Archives of Environmental Contamination and Toxicology.
| 10-03-037 | May 2010 |
Focus on Fish Testing: Fish Testing Planned for Lake Chelan and Wenatchee River in 2010
| 10-03-033 | May 2010 |
Dungeness Bay and Dungeness River Watershed Fecal Coliform Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report
| 10-03-032 | May 2010 |
An Assessment of Washington Lakes: National Lake Assessment Results
| 10-03-029 | April 2010 |
City of Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River
| 10-03-028 | April 2010 |
Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, PAHs, and PBDEs in Washington Rivers and Lakes, 2008
| 10-03-027 | April 2010 |
South Prairie Creek Tributaries Fecal Coliform Bacteria Data Summary: Inglin Creek and Spiketon Ditch
| 10-03-026 | April 2010 |
Nooksack Watershed Planning Area (WRIA 1): Prediction of Gaged Streamflows by Modeling
| 10-03-023 | April 2010 |
Yakima River Pesticides and PCBs Total Maximum Daily Load: Volume 1. Water Quality Study Findings
| 10-03-018 | April 2010 |
Focus on Mitigation that Works Forum
| 08-06-023 | April 2010 |
Frequently Asked Questions: Spokane River Dissolved Oxygen TMDL Dispute Resolution
| 10-10-015 | March 2010 |
Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation
| 10-10-014 | March 2010 |
Frequently Asked Questions: Proposed Aquatic Mosquito Control General Permit
| 10-10-013 | March 2010 |
Chehalis Basin Watershed Assessment: Description of Methods, Models, and Analysis for Water Flow Processes
| 10-06-006 | March 2010 |
Puget Sound Watershed Characterization Project: Description of Methods, Models and Analysis (Draft for Peer Review)
| 10-06-005 | March 2010 |
Quality Assurance Project Plan: Nason Creek (Chelan County) Oxbow Reconnection Monitoring
| 10-03-104 | March 2010 |
Quality Assurance Project Plan: Upper Mainstem Stillaguamish River Dissolved Oxygen Study
| 10-03-103 | March 2010 |
PBT Monitoring: PBDE Flame Retardants in Spokane River Fish, 2009
| 10-03-015 | March 2010 |
General Characterization of PCBs in South Lake Washington Sediments
| 10-03-014 | March 2010 |
Audubon Lake’s Connection to Upper Crab Creek (Lincoln County): Source Assessment
| 10-03-013 | March 2010 |
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2006-2008 Triennial Report
| 10-03-008 | March 2010 |
Erratum Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load Water Quality Improvement Project
| 07-10-073b | March 2010 |
Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report
| 07-10-073 | March 2010 |
Frequently Asked Questions on IFIM: An Overview of the Instream Flow Incremental Methodology
| Q-WR-95-104 | February 2010 |
Public Comment Period: Aquatic Mosquito Control General Permit
| 10-10-006 | February 2010 |
Errata: Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load Water Quality Improvement Project
| 07-10-073a | February 2010 |
Quality Assurance Project Plan: Seasonal Water Quality Study of Vancouver Lake Tributaries for PCBs, Dioxin, and Chlorinated Pesticides
| 10-03-101 | January 2010 |
An Assessment of the PCB and Dioxin Background in Washington Freshwater Fish, with Recommendations for Prioritizing 303(d) Listings
| 10-03-007 | January 2010 |
Union River Watershed Fecal Coliform Total Maximum Daily Load: Water Quality Effectiveness Monitoring
| 10-03-001 | January 2010 |
Frequently Asked Questions: Solving Spokane River’s Dissolved Oxygen Shortage
| 08-10-028 | January 2010 |
Quality Assurance Project Plan Addendum: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study.
| 06-03-105-Addendum1 | January 2010 |