Title | Walla Walla Watershed PCBs, Chlorinated Pesticides, Fecal Coliform, Temperature, pH, and Dissolved Oxygen Total Maximum Daily Load Water Quality Implementation Plan |
||||
|
|||||
VIEW NOW |
Walla Walla Watershed PCBs, Chlorinated Pesticides, Fecal Coliform, Temperature, pH, and Dissolved Oxygen Total Maximum Daily Load Water Quality Implementation Plan (Number of pages: 93) (Publication Size: 3MB)
|
||||
Author(s) | Baldwin, Karen; Gray, Donovan; Jones, Jon | ||||
Description | Ecology began a TMDL in this watershed because the Walla Walla River and several tributaries did not meet water quality standards. Several streams were on the 303(d) list in 1996 and 2004 for not meeting temperature, pH, dissolved oxygen, PCBs, chlorinated pesticides, and fecal coliform standards. Based on the findings in the TMDL, Ecology and the Water Quality Subcommittee develop this water quality implementation plan (WQIP). This plan spells out what will be done in the watershed to address the water quality issues. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Steve Hummel at 509-329-3414 or steve.hummel@ecy.wa.gov | ||||
Keywords | temperature, 303(d), implementation plan, water quality, quality, Walla Walla River Basin, watershed, Total Maximum Daily Load, pesticide, dissolved oxygen, fecal coliform, chlorinated | ||||
WATERSHED | Water Resource Inventory Area 32 Walla Walla | ||||
RELATED PUBLICATIONS | Title:
Walla Walla River Basin Bacteria, pH, and Dissolved Oxygen Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report Walla Walla Watershed Bacteria, pH, and Dissolved Oxygen Total Maximum Daily Load Effectiveness Monitoring Water Quality Study Design (Quality Assurance Project Plan) Quality Assurance Project Plan: Pine Creek Toxaphene Source Assessment Washington State Toxics Monitoring Program: Evaluation of SPMDs for Trend Monitoring of PBTs in Washington Waters 2010-2011 Toxaphene: Improved Recognition in Washington Streams, Rivers, and Lakes Quality Assurance Project Plan: Analyzing Toxaphene at Water Quality Criteria Levels in Treated Lakes and Agricultural Streams Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, and PBDEs in Washington Rivers and Lakes, 2007 PCB Monitoring at Walla Walla and College Place Wastewater Treatment Plants, 2006-07 Walla Walla Watershed Temperature Total Maximum Daily Load: Water Quality Improvement Report Walla Walla River Chlorinated Pesticides and PCBs Total Maximum Daily Load (Water Cleanup Plan): Submittal Report A Total Maximum Daily Load Evaluation for Chlorinated Pesticides and PCBs in the Walla Walla River |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.