Title | Quality Assurance Project Plan: Shelton Cleaners and Laundry |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Shelton Cleaners and Laundry (Number of pages: 13) (Publication Size: 414KB)
|
||||
Author(s) | Marti, P. | ||||
Description | Tetrachloroethylene (PCE) contamination of shallow groundwater was discovered in 1997 during an environmental site assessment of property in Shelton, Washington. PCE was detected at a concentration of 130 µg/L in groundwater from a temporary shallow boring. The likely source of the contamination was identified as the dry cleaning facility located adjacent to where the site assessment was being conducted. Ground water samples will be collected quarterly over a one-year period to determine if PCE and its breakdown products (trichloroethylene, dichloroethylene, and vinyl chloride) are present at deeper depths of the aquifer, and if concentrations are below the MTCA clean-up levels. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Model Toxic Control Act, wells, model, plan, water, quality assurance, quality assurance project plan, toxic, quality, spill, groundwater, ground water | ||||
WEB PAGE | Shelton Laundry groundwater monitoring | ||||
WATERSHED | Water Resource Inventory Area 14 Kennedy-Goldsborough | ||||
DATA | Environmental Information Management (EIM) #PMART001 |
||||
RELATED PUBLICATIONS | Title:
Shelton Laundry and Cleaners, September 2007 through May 2008 Groundwater Monitoring Results Addendum #2 to Quality Assurance Project Plan: Shelton Cleaners and Laundry. Addendum to Quality Assurance Project Plan: Shelton Laundry and Cleaners. Shelton Laundry and Cleaners, August 2005 through May 2006 Groundwater Monitoring Results Shelton Laundry and Cleaners, September 2004 and April 2005 Groundwater Monitoring Results Shelton Laundry and Cleaners, November 2003 and April 2004 Groundwater Monitoring Results Shelton Laundry & Cleaners, July 2002 through April 2003 Groundwater Monitoring Results |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.