Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Guidelines for the Preparation of Industrial Stormwater General Permit Engineering Reports

 
Publication number Date Published
13-10-007February 2013
VIEW NOW Guidelines for the Preparation of Industrial Stormwater General Permit Engineering Reports (Number of pages: 21) (Publication Size: 215KB)




Trouble viewing? Try these free options.
Author(s) Howie, Douglas; Killelea, Jeff
Description This document provides guidance for Engineers in preparing Engineering Reports in accordance with WAC 173-240 for BMPs meeting Industrial Stormwater General Permit Level 3 Improvements.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Doug Howie at 360-407-6444 or douglas.howie@ecy.wa.gov
Keywords industrial stormwater general permit, guidelines, report, industrial stormwater
WEB PAGE Industrial Stormwater General Permit
RELATED PUBLICATIONS Title:

2004 Stormwater Management Manual for Eastern Washington

Submission Of Plans And Reports For Construction Of Wastewater Facilities