Temple Distributing Carson Oil
Site Description
Cleanup Activities
In April 2012, approximately 415 tons of petroleum impacted soils were excavated and disposed of in a landfill. Subsequent confirmation soil samples revealed the presence of petroleum impacted soils exceeding MTCA Method A cleanup levels remaining in the excavation pit, with concentrations of gasoline range organics as high as 3,080 mg/kg and benzene concentrations up to 36 mg/kg.
In April 2012, four groundwater monitoring wells were installed on the property. Goundwater sampling revealed concentrations of gasoline range organics in groundwater as high as 14,500 ug/L and benzene concentrations ranging up to 1,250 ug/L.
In 2015, soil and groundwater samples were taken from the right of way directly north of the Site. More contamination above state cleanup levels was discovered. More environmental investigation is needed to see how far the contamination has spread through soil and groundwater.
Ecology issued an Enforcement Order (DE 14134) in April 2017 requiring additional investigation work and a Feasibility Study to determine how best to address residual petroleum hydrocarbons in soil and groundwater. An Enforcement Order is a legal document issued by Ecology requiring remedial action(s) to be performed at the site. Remedial actions are cleanup activities at contaminated sites. A Feasibility Study (FS) outlines options to cleanup contamination.In accordance with the 2017 Enforcement Order and Remedial Investigation Work Plan, additional borings and monitoring wells were installed in April 2018. Based on the initial sample results, additional borings were completed in December 2018 to define the extent of contamination in the soil to the south and west of the release area.
Documents 35
Legal 13
Public Information 2
Document Title | Document Date | Document Type |
Temple Distributing Carson Oil - Draft Interim Action Work Plan Fact Sheet | 3/1/2023 | Fact Sheet\Public Notices |
Temple Distributing Carson Oil Enforcement Order Fact Sheet | 5/8/2017 | Fact Sheet\Public Notices |
Technical Reports 20
Document Title | Document Date | Document Type |
Temple Distributing Carson Oil - Interim Action Work Plan | 12/13/2022 | Interim Action Documents |
Temple Distributing Carson Oil - ECY Comments on Revised Draft IAWP | 9/8/2022 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - ECY Comments on Draft Groundwater Monitoring Status Report | 9/8/2022 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - ECY Comments on IAWP | 7/1/2022 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Ecology Comments on Draft IAWP | 6/14/2021 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Response to ECYs RI/FS Comments | 3/23/2021 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Ecology Comments of Draft RI/FS | 1/20/2021 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - TFCST | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - TDI | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - TFST | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - Chevron | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - Conway | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - Sharp | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Schedule Revision for EO DE 14134 - Goodman | 10/16/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - ECY Comments on RI/FS | 7/17/2019 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil - Draft RI/FS | 4/12/2019 | Remedial Investigation / Feasibility Study |
Temple Distributing/Carson Oil - Request for Extension to complete RI/FS Report | 3/21/2019 | Site Specific Administrative Document - other (Administrative correspondence) |
Temple Distributing Carson Oil RI Work Plan | 10/3/2017 | Remedial Investigation Work Plan |
Temple Distributing Carson Oil Memo Re: Mass Balance Calculations for Gasoline Release | 9/5/2012 | Site Specific Technical Document - other |
Temple Distributing / Carson Oil fuel spill rpt | 5/4/2012 | Remedial Action Report |
Places to see print documents
-
Central Regional Office1250 W Alder StUnion Gap, 98903-0009Please schedule an appointment to view print documents at this location.
-
Goldendale Community Library131 W Burgen StGoldendale, 98620This location may only have print documents available during open comment periods.
Contaminants 3
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Non-Halogenated Organics - Benzene | C | C | ||||
Non-Halogenated Organics - Petroleum-Diesel | C | C | ||||
Non-Halogenated Organics - Petroleum-Gasoline | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
Public Comment Period March 01, 2023-March 31, 2023
Review the Interim Action Work Plan
• Interim Action Work Plan, dated December 13, 2022
The IAWP proposes the following:
• Excavate and properly dispose of about 820 cubic yards of soil to a depth of about 5 to 9 feet from six targeted excavation areas.
• Backfill the excavated areas with clean soil.
• Decommission two monitoring wells and install three new monitoring wells as part of a long-term groundwater compliance-monitoring program.
• Focus on safety during implementation, including control of truck traffic and dust during excavation.
Submit comments to Mary Monahan, Site Manager by March 31, 2023, 11:59 p.m.
Email: Mary.Monahan@ecy.wa.gov
Mail: 1250 W. Alder Street, Union Gap, WA 98903
Online: Comment form
Next Steps
After the public comment period ends, Ecology will review and respond to comments received and will hold a public meeting if 10 or more people request one. If no significant changes are necessary, the Interim Action Work Plan will become final.