Study ID | GONW0001 |
Study Name | Snoqualmie River TMDL Effectiveness Evaluation |
EIM Data Entry Review Status | Reviewed |
Study Type | Total Maximum Daily Load (TMDL) effectiveness monitoring |
Study Purpose | To evaluate the effectiveness of 1996 Snoqualmie River TMDL conducted by Joe Joy |
Field Collection Date Range | 8/5/2003 - 9/7/2005 |
Data First/Last Loaded Date |  |
Data Last Updated Date |  |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | George Onwumere |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 3: QAPP, SAP, or Equivalent. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | EIM data includes the field replicates and not the lab duplicates (per protocol). The written report lists the lab duplicates and not the field replicates. Two locations changed names after the report was written. EIM lists the locations with their new current and correct names (M44018 is the “old” RM 1.5 and SFSR457 is the “old” RM 2.0). |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |