Study ID | JJOY0001 |
Study Name | Snoqualmie River TMDL |
EIM Data Entry Review Status | Reviewed |
Study Type | Total Maximum Daily Load (TMDL) development |
Study Purpose | To describe baseline water quality evaluate the relative impacts of current point and nonpoint discharges of conventional contaminants and to establish any TMDLs necessary to maintain protect a high level of water quality for existing benefical uses. |
Field Collection Date Range | 7/24/1989 - 9/25/1991 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Joe Joy |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 1: Informal or no QA documentation. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |