Study Details

Study ID:  PPIC0007

Download  Download Study Data

Study Basics

Study IDPPIC0007
Study NamePend Oreille River Total Dissolved Gas TMDL
EIM Data Entry Review StatusNot Reviewed
Study TypeTotal Maximum Daily Load (TMDL) development
Study PurposeThis Quality Assurance (QA) Project Plan describes monitoring for Total Dissolved Gas (TDG)in the Pend Oreille River in Washington State, to be used in development of a TDG Total Maximum Daily Load (TMDL). TDG will be monitored continuously in the Pend Oreille River near Ruby, about halfway between Newport and Box Canyon Dam. TDG will also be measured at regular intervals from April through July as paired readings with other meters operated by dam owners above Newport and at Box Canyon and Boundary Dams, as well as at the Ecology meter. Data quality, analytical, and reporting procedures are also described.
Field Collection Date Range5/4/2004 - 7/11/2004
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactPaul Pickett
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan DescriptionThe overall goal of the project is to set TMDLs by evaluating the effects of dam spills on TDG in the river.
Study QA Assessment LevelLevel 3: Data Verified and Assessed for Usability
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)