Study ID | PPIC0007 |
Study Name | Pend Oreille River Total Dissolved Gas TMDL |
EIM Data Entry Review Status | Not Reviewed |
Study Type | Total Maximum Daily Load (TMDL) development |
Study Purpose | This Quality Assurance (QA) Project Plan describes monitoring for Total Dissolved Gas (TDG)in the Pend Oreille River in Washington State, to be used in development of a TDG Total
Maximum Daily Load (TMDL). TDG will be monitored continuously in the Pend Oreille River
near Ruby, about halfway between Newport and Box Canyon Dam. TDG will also be measured
at regular intervals from April through July as paired readings with other meters operated by dam
owners above Newport and at Box Canyon and Boundary Dams, as well as at the Ecology meter.
Data quality, analytical, and reporting procedures are also described. |
Field Collection Date Range | 5/4/2004 - 7/11/2004 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Paul Pickett |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | The overall goal of the project is to set TMDLs by evaluating the effects of dam spills on TDG in the river. |
Study QA Assessment Level | Level 3: Data Verified and Assessed for Usability |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |