Study Details

Study ID:  SPI_PG06

Download  Download Study Data

Study Basics

Study IDSPI_PG06
Study NameSediment Profile Imaging Feasibility Study - Port Gamble
EIM Data Entry Review StatusReviewed
Study TypeContaminated site investigation (characterization, includes RI/FS and remedial design)
Study PurposeTo determine if Sediment Profile Imaging (SPI) data can be used to predict more traditional measures of sediment quality
Field Collection Date Range7/10/2006 - 8/30/2006
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactTom Gries
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 3: QAPP, SAP, or Equivalent.
Study QA Project Plan Description
Study QA Assessment LevelLevel 4: Data Verified and Assessed for Usability in a Formal Study Report
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID93937775
Ecology Cleanup Site ID3444
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)

 

Study Documents and Publications

Linked Documents (184)

 TitleDate Ecology ProgramType

Group: Legal

  Pope and Talbot Inc Sawmill AO Remedial Action 09/01/2005TCP Cleanup Site DocumentsAgreed Order
  Pope and Talbot Inc Sawmill AO for RI/FS 10/01/2007TCP Cleanup Site DocumentsAgreed Order
  Port Gamble Bay and Mill Site Final Consent Decree December 2013 12/20/2013TCP Cleanup Site DocumentsConsent Decree
  Port Gamble Bay and Mill Site Draft Upland Agreed Order October 2017 10/17/2017TCP Cleanup Site DocumentsAgreed Order
  Port Gamble Bay and Mill Site Upland Agreed Order February 2018 02/05/2018TCP Cleanup Site DocumentsAgreed Order
  Port Gamble Bay and Mill Site Upland Consent Decree 11/30/2020TCP Cleanup Site DocumentsConsent Decree

Group: Map

  Port Gamble 1990 Dredging Boundary 01/25/1990TCP Cleanup Site DocumentsGIS Shapefiles
  Port Gamble Bay Preservation and Restoration Provisio Funds Map October 2013 10/31/2013TCP Cleanup Site DocumentsMap
  Port Gamble Bay Restoration and Preservation Projects Western Shoreline Block March 2014 03/24/2014TCP Cleanup Site DocumentsMap
  Detail of SMA-1 cap repair at jetty 01/11/2017TCP Cleanup Site DocumentsMap
  Location of additional hardscape areas in sediment stockpile footpring. 10/02/2017TCP Cleanup Site DocumentsMap

Group: Natural Resource Damage related documents

  Port Gamble Baseline Investigations: Marine Natural Resources 02/01/2007TCP Cleanup Site DocumentsNRDA Preassessment
  Natural Resource Trustee Memorandum of Agreement for Port Gamble Bay and Mill Site 09/14/2014TCP Cleanup Site DocumentsNRDA Legal Document
  Memorandum of Agreement Appendix C: Agreement to be Bound 01/23/2015TCP Cleanup Site DocumentsNRDA Legal Document
  Toxic contaminants in bay mussels transplanted to Port Gamble Bay, WA before cleanup and restoration 06/01/2015TCP Cleanup Site DocumentsNRDA Injury Assessment
  Toxic contaminants in embryonic and adult Pacific Herring from Port Gamble Bay 06/30/2015TCP Cleanup Site DocumentsNRDA Injury Assessment
  2016 Port Gamble Bay Damage Assessment English Sole Survey 06/01/2016TCP Cleanup Site DocumentsNRDA Injury Assessment
  Sulfide Effects on Aquatic Organisms Literature Review 01/01/2017TCP Cleanup Site DocumentsNRDA Technical Document
  Natural Resource Damage Assessment Funding and Participation Agreement 06/09/2017TCP Cleanup Site DocumentsNRDA Legal Document
  First Amendment to Natural Resource Damage Assessment Funding and Participation Agreement 07/09/2018TCP Cleanup Site DocumentsNRDA Legal Document
  Resolution 7_2020-LAT Designation_Port Gamble Bay Trustee Council 10/15/2020TCP Cleanup Site DocumentsNRDA Legal Document
  Second Amendment to Natural Resource Damage Assessment Funding and Participation Agreement 12/03/2020TCP Cleanup Site DocumentsNRDA Legal Document

Group: Public Information

  Pope and Talbot Inc Sawmill Fact Sheet Draft Plans for An Interim Action 10/01/2006TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Leased Area Department Of Natural Resources 05/01/2008TCP Cleanup Site DocumentsPublic Participation Plan
  Pope and Talbot Inc Sawmill Site Investigation Documents 05/01/2008TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Leased Area Fact Sheet Site Investigation Documents Ready for Public Review 05/01/2008TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Leased Area Public Participation Plan 05/01/2008TCP Cleanup Site DocumentsPublic Participation Plan
  Pope and Talbot Inc Sawmill Site Investigation Documents 05/30/2008TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble leased Area Site Fact Sheet 02/01/2011TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Pope & Talbot, Inc. Sawmill Site Fact Sheet 02/01/2011TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Leased Area Fact Sheet Investigation and Cleanup Documents 02/01/2011TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Pope and Talbot Inc Sawmill Public Participation Plan 02/23/2011TCP Cleanup Site DocumentsPublic Participation Plan
  Port Gamble Bay and Mill Site Response to RI/FS Comments February 2013 02/20/2013TCP Cleanup Site DocumentsResponsiveness Summary
  Port Gamble Bay and Mill Site Draft RIFS Response to 2011 Public Comments February 2013 02/23/2013TCP Cleanup Site DocumentsResponsiveness Summary
  Port Gamble Bay Public Participation Plan October 2013 10/08/2013TCP Cleanup Site DocumentsPublic Participation Plan
  Port Gamble Bay Fact Sheet October 2013 10/09/2013TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Bay Response to Comments on the Consent Decree December 2013 12/17/2013TCP Cleanup Site DocumentsResponsiveness Summary
  Port Gamble Bay Cleanup and Restoration Focus Sheet April 2014 04/22/2014TCP Cleanup Site DocumentsFocus Sheet
  Port Gamble Bay Public Meeting Notice May 2015 05/14/2015TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Bay and Mill Site Public Meeting Presentation May 27 2015 05/27/2015TCP Cleanup Site DocumentsPublic Participation Plan
  Port Gamble Boards 07/16/2015TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Presentation 07/16/2015TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Bay and Mill Site Final Fact Sheet October 2017 10/18/2017TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Bay and Mill Site Fact Sheet 04/20/2020TCP Cleanup Site DocumentsFact Sheet\Public Notices
  Port Gamble Bay and Mill Final Responsiveness Summary 07/15/2020TCP Cleanup Site DocumentsResponsiveness Summary
  Port Gamble Five Year Review - Fact Sheet 03/10/2023TCP Cleanup Site DocumentsFact Sheet\Public Notices

Group: State Environmental Policy Act

  Port Gamble Bay SEPA Checklist July 2006 07/20/2006TCP Cleanup Site DocumentsSEPA Documents
  Port Gamble Bay SEPA Determination of Non-Significance December 2006 12/06/2006TCP Cleanup Site DocumentsSEPA Documents
  Port Gamble Mitigated Determination of Non-Significance October 2013 10/09/2013TCP Cleanup Site DocumentsSEPA Documents
  Port Gamble Bay SEPA Checklist October 2013 10/09/2013TCP Cleanup Site DocumentsSEPA Documents
  Port Gamble Bay and Mill Site SEPA Checklist 04/21/2020TCP Cleanup Site DocumentsSEPA Documents
  Port Gamble Bay and Mill Site Determination of Non-Significance Letter 04/21/2020TCP Cleanup Site DocumentsSEPA Documents

Group: Technical Reports

  Port Gamble Leased Area Site Hazard Assessment 07/05/2001TCP Cleanup Site DocumentsSite Hazard Assessment Report
  Pope and Talbot Inc Sawmill Sediment Management Standards Interim Remedial Action Plan 07/18/2006TCP Cleanup Site DocumentsInterim Action Documents
  Port Gamble Leased Area Work Plan to Perform a Remedial Investigation and Feasibility Study (RI/FS) 03/06/2008TCP Cleanup Site DocumentsRemedial Investigation Work Plan
  Port Gamble Bay and Preservation Remedial Investigation Construction Completion Report June 2008 06/13/2008TCP Cleanup Site DocumentsInterim Action Documents
  Pope and Talbot Inc Sawmill RI/FS 02/01/2011TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Pope and Talbot Inc Sawmill Feasibility Study 02/01/2011TCP Cleanup Site DocumentsFeasibility Study
  Port Gamble Leased Area Remedial Investigation 02/11/2011TCP Cleanup Site DocumentsRemedial Investigation Report
  Port Gamble Leased Area Feasibility Study 02/17/2011TCP Cleanup Site DocumentsFeasibility Study
  Port Gamble Open House and Public Meeting Presentation March 2011 03/09/2011TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Sawmill Area, Remedial Investigation/Feasability Study, December 2012 12/01/2012TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Remedial Investigation for Sediment Unit and Sawmill Unit, Final, December 2012 12/01/2012TCP Cleanup Site DocumentsRemedial Investigation Report
  Port Gamble Remedial Investigation/Feasibility Study Former Pope & Talbot Inc. Sawmill site 12/20/2012TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Port Gamble Bay and Mill Site Final Feasibility Study December 2012 12/21/2012TCP Cleanup Site DocumentsFeasibility Study
  Port Gamble Bay and Mill Site Final Remedial Investigation Report December 2012 12/21/2012TCP Cleanup Site DocumentsRemedial Investigation Report
  Port Gamble Response to Remedial Investigation Comments February 2013 02/12/2013TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation Projects Funds Panel Recommendation October 2013 10/01/2013TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Partial RIFS October 2013 10/03/2013TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Port Gamble Bay Draft Cleanup Action Plan October 2013 10/09/2013TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Bay Funds Project Descriptions October 2013 10/10/2013TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamle Bay Restoration and Preservation Projects Slide Show October 2013 10/17/2013TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation Harper Estuary Restoration Project Sampling and Analysis Plan - Quality Assurance Project Plan February 2014 02/19/2014TCP Cleanup Site DocumentsSampling and Analysis Plan
  Port Gamble Bay and Mill Site Final Cleanup Action Plan December 2013 02/20/2014TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Bay Restoration and Preservation Herring Study Information March 2014 03/24/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Preservation and Restoration Eelgrass Restoration March 2014 03/24/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation Harper Estuary Final Data Report April 2014 04/20/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation Point Julia Pier Removal and Beach Restoration 07/14/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation - Riparian Restoration of the Western Shoreline Block 07/14/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Preservation and Restoration Project Implementation Schedule March 2014 07/14/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation Baywide Debris, Derelict Gear and Vessel Removal March 2014 07/14/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Restoration and Preservation Olympia Oyster Enhancement March 2014 07/14/2014TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay and Mill Site Final Engineering and Design Report May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix A Pre-Design Investigation Report May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix B CAP Design May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix C Geotechnical Engineering Evaluation May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix D Coastal Engineering Evaluation May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix E Construction Quality Assurance Plan May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix G Construction Outreach May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix N Shellfish Monitoring Plan May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix F May 2015 05/22/2015TCP Cleanup Site DocumentsEngineering Design Report
  Stormwater Pollution Prevention (SWPPP) Plan 09/24/2015TCP Cleanup Site DocumentsConstruction Plans and Specifications
  Port Gamble Bay and Mill Site Engineering Design Report Appendix H September 2015 09/29/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix I September 2015 09/29/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix J September 2015 09/29/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix K September 2015 09/29/2015TCP Cleanup Site DocumentsEngineering Design Report
  Port Gamble Bay and Mill Site Engineering Design Report Appendix M September 2015 09/29/2015TCP Cleanup Site DocumentsEngineering Design Report
  Revised SMA-2 dredge plan drawings 09/26/2016TCP Cleanup Site DocumentsConstruction Plans and Specifications
  Final Design - Revised SMA-2 Dredse Plan Port Gamble 10/03/2016TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Bay Cleanup Coastal Engineering Evaluation of Shoreline Erosion 10/07/2016TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Revised Final Design SMA-2 Dredge Plan Modifications 10/17/2016TCP Cleanup Site DocumentsConstruction Plans and Specifications
  Port Gamble Bay Cleanup Project Coastal Engineering Evaluation of Shoreline Erosion 12/06/2016TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Port Gamble Final Cleanup Action Report Season 1 Part 2 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Bay Final Cleanup Action Report Season 1 Part 3 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 4 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 5 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 6 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 7 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 8 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 9 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 1 Part 10 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Reprort Season 1 Part 11 December 2016 12/12/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Modification of armoring in SMA-1 12/13/2016TCP Cleanup Site DocumentsConstruction Plans and Specifications
  Port Gamble Final Cleanup Action Report Season 1 Part 1 December 2016 12/16/2016TCP Cleanup Site DocumentsCleanup Action Plan
  Post-stockpile Removal – Sampling and Quality 02/08/2017TCP Cleanup Site DocumentsSampling and Analysis Plan
  Port Gamble Bay Sediment Stockpile Sampling and Analysis Plan 02/28/2017TCP Cleanup Site DocumentsSampling and Analysis Plan
  Port Gamble Bay Stockpile Sampling and Anaylsis Plan 02/28/2017TCP Cleanup Site DocumentsSampling and Analysis Plan
  Port Gamble Bay Stockpile Sampling and Anaylsis Plan drawing 02/28/2017TCP Cleanup Site DocumentsSampling and Analysis Plan
  Appendix E Groundwater Monitoring Plan - Model Airplane Field Limited Purpose Landfill 03/20/2017TCP Cleanup Site DocumentsGroundwater Monitoring Report
  Supplemental Port Gamble Bay In-Situ Shellfish Monitoring Data Memorandum 08/09/2017TCP Cleanup Site DocumentsHuman Health and/or Eco Risk Assessment
  Port Gamble In-water As Built Construction Drawings 11/06/2017TCP Cleanup Site DocumentsConstruction Plans and Specifications
  Port Gamble Cleanup Action Report Summary of Season 1 and 2 November 2017 11/17/2017TCP Cleanup Site DocumentsCleanup Action Plan
  Post-Stockpile Sampling 12/15/2017TCP Cleanup Site DocumentsSampling and Analysis Plan
  Port Gamble Final Cleanup Action Report Season 2 Part 1 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 2 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 3 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 4 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 5 02/13/2018TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Final Cleanup Action Report Season 2 Part 6 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Report Season 2 Part 7 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 8 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 9 Feburary 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 10 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 11 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 12 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 13 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 14 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 15 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 16 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 17 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port GambleFinal Cleanup Action Report Season 2 Part 18 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 19 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 20 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 21 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 22 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 23 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 24 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Report Season 2 Part 25 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 26 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Plan Season 2 Part 27 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 28 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 29 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 30 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 31 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamle Final Cleanup Action Report Season 2 Part 32 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 33 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 34 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 35 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 36 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 37 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 38 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 39 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 40 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Port Gamble Final Cleanup Action Report Season 2 Part 41 February 2018 02/13/2018TCP Cleanup Site DocumentsFinal Cleanup Action Report
  Appendix F Operations, Maintenance, and Monitoring Plan 02/26/2018TCP Cleanup Site DocumentsOperation and Maintenance Plan
  Port Gamble Long Term Monitoring Toxicology Report Part 6 (Appendix C) December 2018 12/07/2018TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Test Ignore 01/01/2019TCP Cleanup Site DocumentsScope Of Work
  Port Gamble Year 1 Post Construction Long Term Monitoring Report Part 1 (Introduction, Appendix A,B,D February 2019 02/05/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Port Gamble Year 1 Post Construction Long Term Monitoring Report Part 2 (Appendix D) February 2019 02/05/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Port Gamble Year 1 Post Construction Long Term Monitoring Report Part 3 (Appendix D) February 2019 02/05/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Port Gamble Year 1 Post Construction Long Term Monitoring Report Part 4 (Appendix D) February 2019 02/05/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Port Gamble Year 1 Post Construction Long Term Monitoring Report (Appendix E, F) February 2019 02/05/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Port Gamble Year 1 Post Construction Long Term Monitoring Report Part 5 (Appendix D) February 2019 02/05/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Port Gamble Bay and MIll Site Upland Supplemental RI/FS Report incuding Tables and Figures 04/30/2019TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Port Gamble Bay and Mill Site Upland Supplemental RI/FS Appendix A through C 04/30/2019TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Port Gamble Bay and Mill Site Upland Supplemental RI/FS Appendix D through G 04/30/2019TCP Cleanup Site DocumentsRemedial Investigation / Feasibility Study
  Voluntary Eelgrass Transplant: Work Plan and Dive Safety Plan 05/20/2019TCP Cleanup Site DocumentsHealth and Safety Plan
  Coastal Engineering Evaluation of Shoreline Erosion Rev 8-2-19 07/02/2019TCP Cleanup Site DocumentsPerformance/Confirmational Monitoring Plan or Report
  Year 3 Voluntary Eelgrass Transplant Memorandum 08/01/2019TCP Cleanup Site DocumentsProgress Report
  Port Gamble Bay and Mill Site Upland Draft Cleanup Action Plan including SEPA Documents 04/15/2020TCP Cleanup Site DocumentsCleanup Action Plan
  Port Gamble Five Year Review 09/01/2022TCP Cleanup Site DocumentsPeriodic Review (5 Year)
  Port Gamble Integrated Cleanup and Habitat Restoration Engineering Design Report 01/31/2024TCP Cleanup Site DocumentsEngineering Design Report

Group: Voluntary Cleanup Program

  Port Gamble Bay & Mill Site - VCP Opinion on Sediment Cleanup 06/24/2003TCP Cleanup Site DocumentsVCP Opinion on Site Cleanup – Other
  Port Gamble Log Storage Lease Area NW1088 NFA Letter 07/21/2003TCP Cleanup Site DocumentsVCP Opinion on Site Cleanup – NFA