Study ID | RCOO0013 |
Study Name | Port Gardner Sediment Monitoring Component |
EIM Data Entry Review Status | Reviewed |
Study Type | General environmental study |
Study Purpose | To acquire current data on toxics in Port Gardner Bay |
Field Collection Date Range | 6/19/2012 - 6/19/2012 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Randy Coots |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | This Addendum to the original Quality Assurance Project Plan (Dutch et al., 2009) presents details specific to this study not addressed in the original plan. Details include project organization and schedule, sample locations, quality assurance, analytical parameters and methods, and laboratory costs. |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |