Study ID | BZAL0001 |
Study Name | Woodland Creek Temperature TMDL |
EIM Data Entry Review Status | Reviewed |
Study Type | Total Maximum Daily Load (TMDL) development |
Study Purpose | The purpose of the Woodland Creek temperature study is to characterize mainstem and tributary surface water temperature regimes, channel morphology, hydrology, and streamside vegetation within the watershed. |
Field Collection Date Range | 6/18/2002 - 10/31/2002 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Debby Sargeant |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 3: Data Verified and Assessed for Usability |
Study Result Description | |
Study Comment | Data are in support of the Henderson TMDL and are discussed in that report (publication 06-03-012) |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |