| Study ID | RFCR |
| Study Name | Rocky Ford Creek TMDL Study |
| EIM Data Entry Review Status | Reviewed |
| Study Type | Total Maximum Daily Load (TMDL) development |
| Study Purpose | 1Assess the nutrient phosphorus and nitrogen levels of Rocky Ford Creek and the springs which feed it. 2 Assess the impact two fish hatcheries are having on creek water quality. 3 Estimate loading of nutrients from Rocky Ford Creek to Moses Lake. |
| Field Collection Date Range | 8/20/1997 - 11/4/1997 |
| Data First/Last Loaded Date |  |
| Data Last Updated Date |  |
| Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
| Ecology Contact | Robert Cusimano |
| Ecology Monitoring Program | |
| Submitting Organization | |
| Study QA Planning Level | LEVEL 3: QAPP, SAP, or Equivalent. |
| Study QA Project Plan Description | Total variation for field sampling and lab analysis assesed by collection of at least 10% replicate samples. All lab samples preserved as specified by Manchester Environmental Laboratory MEL 1994. All field sampling and measurements met WAS protocols. |
| Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
| Study Result Description | |
| Study Comment | |
| Linked Study | |
| Ecology Funding Number | |
| Ecology Facility/Site ID | |
| Ecology Cleanup Site ID | |
| Recommended QC Blank Censor Factor | |
| Study ID Aliases (Alias Type) | |