Study ID | MVP003 |
Study Name | Additional Study of Low Dissolved Oxygen Levels In The Upper Stillaguamish River Main Stem |
EIM Data Entry Review Status | Reviewed |
Study Type | Total Maximum Daily Load (TMDL) effectiveness monitoring |
Study Purpose | The purpose of the Stillaguamish River dissolved oxygen project is to characterize processes causing low dissolved oxygen in the Stillaguamish River Island Reach between 16.86 RM (RKM 28.5) near Arlington to 11.35 RM (RKM 19.19) near I-5 during the critical low-flow period. |
Field Collection Date Range | 8/14/2011 - 10/10/2012 |
Data First/Last Loaded Date | ![](../Images/loading.gif) |
Data Last Updated Date | ![](../Images/loading.gif) |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Markus Von Prause |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 3: Data Verified and Assessed for Usability |
Study Result Description | |
Study Comment | QUAL2kw modeling will begin in July 2013. The QUAL2kw model completion date is scheduled for 6/30/2015. All flow and Continious data products will be QA'd and entered into EIM by 6/30/2015. |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |