Study Details

Study ID:  DNOR0005

Download  Download Study Data

Study Basics

Study IDDNOR0005
Study NameCommencement Bay In-Line Trap Project
EIM Data Entry Review StatusReviewed
Study TypeGeneral environmental study
Study PurposeThe primary objective was to determine contaminant concentrations associated with suspended particulate matter entering the waterway.To evaluate source control efforts and determine the potential for recontamination of bottom sediments in Thea Foss.
Field Collection Date Range4/22/1998 - 4/22/1998
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactDale Norton
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 3: QAPP, SAP, or Equivalent.
Study QA Project Plan Description
Study QA Assessment LevelLevel 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Result DescriptionThe data collected indicated that concentrations of 28 individual chemicals exceeded the Commencement Bay Sediment Quality Objectives.High concentrations of mercury zinc and tributyltin were also measured near Picks Cove Marina.
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)