Study Details

Study ID:  WAR044701_S8D

Download  Download Study Data

Study Basics

Study IDWAR044701_S8D
Study NamePort of Seattle Marine Division Phase I Municipal Stormwater Permit
EIM Data Entry Review StatusNot Reviewed
Study TypeMunicipal stormwater permit, outfall monitoring
Study PurposeTo fulfill stormwater monitoring requirements per Section S8.D of the Phase I Permit
Field Collection Date Range3/13/2009 - 4/20/2012
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible Entity
Ecology ContactEd Abbasi
Ecology Monitoring Program
Submitting OrganizationPort of Seattle - Seattle WA
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan DescriptionEcology approved QAPP for S8.D
Study QA Assessment LevelLevel 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)