Study Details

Study ID:  PALERMO

Download  Download Study Data

Study Basics

Study IDPALERMO
Study NamePalermo Wellfield Superfund Site
EIM Data Entry Review StatusReviewed
Study TypePost-cleanup, long-term confirmational monitoring of remediated contaminated site (periodic review, operation & maintenance)
Study PurposePerform the long-term monitoring and sampling of the subdrain system and treatment lagoon at the Palermo Wellfield Superfund Site in Tumwater, Washington.
Field Collection Date Range12/3/2002 - 11/3/2008
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactPam Marti
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan Description
Study QA Assessment LevelLevel 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID55237647
Ecology Cleanup Site ID4616
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)

 

Study Documents and Publications

Linked Publications (6)

Linked Documents (21)

 TitleDate Ecology ProgramType

Group: Legal

  Record of Decision Palermo Wellfield 11/16/1999TCP Cleanup Site DocumentsRecord of Decision
  Palermo CERCLA Site Record of Decision Amendment, State Concurrence 09/27/2024TCP Cleanup Site DocumentsRecord of Decision
  Record of Decision Amendment Palermo Wellfield Superfund Site Operable Unit 2 11/07/2024TCP Cleanup Site DocumentsRecord of Decision

Group: Public Information

  Palermo Superfund cleanup gets a checkup 12/01/2003TCP Cleanup Site DocumentsFact Sheet\Public Notices

Group: Technical Reports

  Palermo Wellfield - First Five-Year Review Report 09/01/2003TCP Cleanup Site DocumentsPeriodic Review (5 Year)
  Fourth Five-Year Review Report for Palermo Wellfield Groundwater Contamination Superfund Site Thurston County, Washington 09/17/2018TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Appointment of new Remedial Project Manager for the Palermo Wellfield Superfund Site 12/29/2022TCP Cleanup Site DocumentsSite Specific Administrative Document - other (Administrative correspondence)
  Conceptual Site Model Palermo OU2 Wellfield Superfund Site Remedial Investigation/Feasibility Study 02/01/2023TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Palermo OU2 QAPP for Remedial Investigation/Feasibility Study 03/01/2023TCP Cleanup Site DocumentsSite Specific Technical Document - other
  PalermoOU2 QAPP Addendum No 2- Additional Monitoring Wells and Borings 08/01/2023TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Quality Assurance Project Plan Addendum No. 4 Horizontal Soil Vapor Extraction Treatability Study Palermo Wellfield Superfund Site 09/01/2023TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Fifth Five-Year Review Report for Palermo Wellfield Ground Water Contamination Superfund Site Thurston County, Washington 09/19/2023TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Supplemental Remedial Investigation Report for Operable Unit 2 PCE Palermo Well Field Superfund Site 10/01/2023TCP Cleanup Site DocumentsRemedial Investigation Report
  CMT Well Installation Correspondence 11/03/2023TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Variance from Washington Administrative Code (WAC) 173-160-420(3), WAC 173-160-420, WAC 173-160-450, and WAC 173-160-430 11/20/2023TCP Cleanup Site DocumentsSite Specific Administrative Document - other (Administrative correspondence)
  Palermo Wellfield Superfund Site Comments on Final Focused Feasibility Study Report 12/07/2023TCP Cleanup Site DocumentsSite Specific Administrative Document - other (Administrative correspondence)
  Final Focused Feasibility Study Report Operable Unit 2 PCE Palermo Wellfield Superfund Site 02/01/2024TCP Cleanup Site DocumentsFeasibility Study
  Palermo Wellfield Superfund Site Operable Unit 2 Proposed Plan 04/09/2024TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Palermo Wellfield Superfund - Operable Unit 2 Proposed Plan 05/08/2024TCP Cleanup Site DocumentsSite Specific Administrative Document - other (Administrative correspondence)
  SVE Treatability Study Ecology Notice 06/21/2024TCP Cleanup Site DocumentsSite Specific Technical Document - other
  Variance from Washington Administrative Code (WAC) 173-160-420(3). 07/10/2024TCP Cleanup Site DocumentsSite Specific Administrative Document - other (Administrative correspondence)