Skip to main content
EIM
Search
Environmental Information Management System
Search Home
All
Studies
Locations
Results
Bioassay
Groundwater
Help Center
Contact EIM
EIM News
EIM data last updated on
Saturday, June 29, 2024
Study Details
Study ID:
PALERMO
Download Study Data
Study Basics
Study ID
PALERMO
Study Name
Palermo Wellfield Superfund Site
EIM Data Entry Review Status
Reviewed
Study Type
Post-cleanup, long-term confirmational monitoring of remediated contaminated site (periodic review, operation & maintenance)
Study Purpose
Perform the long-term monitoring and sampling of the subdrain system and treatment lagoon at the Palermo Wellfield Superfund Site in Tumwater, Washington.
Field Collection Date Range
12/3/2002 - 11/3/2008
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible Entity
Ecy Environmental Assessment Program
Ecology Contact
Pam Marti
Ecology Monitoring Program
Submitting Organization
Study QA Planning Level
LEVEL 4: Approved QAPP or SAP.
Study QA Project Plan Description
Study QA Assessment Level
Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
55237647
Ecology Cleanup Site ID
4616
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)
Study Data Summary (Record Count or Type)
Study Documents and Publications
Linked Publications (6)
Title
Publication Number
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003
03-03-046
Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site
03-03-101
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 2004
04-03-038
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005
05-03-027
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 2006
06-03-035
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, November 2006 and June 2007
07-03-044
Linked Documents (5)
Title
Date
Ecology Program
Type
Group: Public Information
Palermo Superfund cleanup gets a checkup
12/01/2003
TCP Cleanup Site Documents
Fact Sheet\Public Notices
Group: Technical Reports
Palermo Wellfield - First Five-Year Review Report
09/01/2003
TCP Cleanup Site Documents
Periodic Review (5 Year)
Appointment of new Remedial Project Manager for the Palermo Wellfield Superfund Site
12/29/2022
TCP Cleanup Site Documents
Site Specific Administrative Document - other (Administrative correspondence)
Palermo Wellfield Superfund Site Comments on Final Focused Feasibility Study Report
12/07/2023
TCP Cleanup Site Documents
Site Specific Administrative Document - other (Administrative correspondence)
Palermo Wellfield Superfund - Operable Unit 2 Proposed Plan
05/08/2024
TCP Cleanup Site Documents
Site Specific Administrative Document - other (Administrative correspondence)
Ecology Home
|
EIM Home
|
Search
|
Submit Data
|
MyEIM
|
Help Center
|
Contact EIM
|
Data Disclaimer
Ecology Privacy Notice
Accessibility
Copyright © EIM Search, Washington State Department of Ecology, All Rights Reserved