Study ID | ddug0001 |
Study Name | Nason Creek Oxbow Reconnection Monitoring |
EIM Data Entry Review Status | Reviewed |
Study Type | General environmental study |
Study Purpose | The purpose of this project is to continue a program of salmonid monitoring surveys in a reconnected oxbow on Nason Creek that was first sampled in 2007-2008 by the Yakama Nation. These surveys will determine if the restored connection to the Nason Oxbow will produce an increase in reach-level abundance of salmonids by season and species within the first three years following construction relative to two reference sites. |
Field Collection Date Range | 6/29/2007 - 8/20/2010 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Daniel Dugger |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |