Study ID | GMER0004 |
Study Name | Union River FC TMDL Attainment Monitoring |
EIM Data Entry Review Status | Reviewed |
Study Type | Total Maximum Daily Load (TMDL) effectiveness monitoring |
Study Purpose | Based on a TMDL study (Ward et al., 2001), the Detailed Implementation Plan (DIP) provides fecal coliform allocation targets for each of five stations in the Union River watershed. This study will evaluate whether these five stations meet the targets specified by the DIP. |
Field Collection Date Range | 5/5/2008 - 4/10/2009 |
Data First/Last Loaded Date |  |
Data Last Updated Date |  |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Glenn Merritt |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |