Study ID | G0800097 |
Study Name | NF Palouse River TMDL Implementaiton Project |
EIM Data Entry Review Status | Not Reviewed |
Study Type | Total Maximum Daily Load (TMDL) effectiveness monitoring |
Study Purpose | Designated beneficial uses in the North Fork Palouse River to be restored or protected, 303(d)-listed water bodies restored to water quality standards, healthy water prevented from being degraded. Also, regulatory compliance with a consent decree, compliance order, Total Maximum Daily Load (TMDL) or waste load allocation, etc., achieved. |
Field Collection Date Range | 3/8/2008 - 11/16/2011 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Water Quality Program, Eastern Region |
Ecology Contact | Elaine Snouwaert |
Ecology Monitoring Program | |
Submitting Organization | Palouse Conservation District - Pullman WA |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | The objectives of the grant is to improve water quality by implementing tasks specifically outlined in the North Fork Palouse River Fecal Coliform TMDL Water Quality Implementation Plan released by Ecology in June 2006. These objectives are locating sources, accessing BMP effectiveness, and documenting riparian changes. Monitoring for fecal coliform bacteria, instream flows, and temperature will be conducted at all sites. Data quality, analytical, and reporting procedures are described. The QAPP was approved on April 30, 2008. |
Study QA Assessment Level | Level 3: Data Verified and Assessed for Usability |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | G0800097 |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |