Study Details

Study ID:  TOFTDAHL

Download  Download Study Data

Study Basics

Study IDTOFTDAHL
Study NameToftdahl Drum Site
EIM Data Entry Review StatusReviewed
Study TypeGeneral environmental study
Study PurposeCompliance ground water monitoring for the Toxics Cleanup Program at the Toftdahl drum site.
Field Collection Date Range4/11/1990 - 6/24/1996
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactPam Marti
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan Description
Study QA Assessment LevelLevel 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)