Study ID | BCAR006 |
Study Name | Edison large on-site sewage system (LOSS) - Groundwater study |
EIM Data Entry Review Status | Reviewed |
Study Type | Monitoring for NPDES permit requirements |
Study Purpose | The purposeof this study is to characterize groundwater flow direction and water quality in the vicinity of the Edison LOSS drainfield. This informatio will be used to determine whether nutrients and/or bacteria from the system are reaching Edison Slough or degrading groundwater quality. |
Field Collection Date Range | 9/15/2014 - 10/9/2020 |
Data First/Last Loaded Date | ![](../Images/loading.gif) |
Data Last Updated Date | ![](../Images/loading.gif) |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Barb Carey |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | 25144556 |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |