Study ID | WAR044002_S8D |
Study Name | Pierce County Phase I Municipal Stormwater Permit |
EIM Data Entry Review Status | Reviewed |
Study Type | Municipal stormwater permit, outfall monitoring |
Study Purpose | The goal of this stormwater characterization monitoring project is to meet the requirements of Section S8.D of the Phase I Municipal Stormwater Permit. The purpose of the permit is to provide Ecology with information on the pollutant loading and average event mean concentrations from representative basins serviced by municipal storm sewer systems. Each basin is to represent a different land use type, so that pollutant export can be correlated with land use within the basins. |
Field Collection Date Range | 9/25/2010 - 10/18/2013 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Water Quality Program, Southwest Region |
Ecology Contact | Chris Montague-Breakwell |
Ecology Monitoring Program | |
Submitting Organization | Pierce County Public Works Surface Water Mgmt - Tacoma WA |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | Ecology Approved QAPP for S8.D |
Study QA Assessment Level | Level 4: Data Verified and Assessed for Usability in a Formal Study Report |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |