Study Details

Study ID:  WAR044002_S8D

Download  Download Study Data

Study Basics

Study IDWAR044002_S8D
Study NamePierce County Phase I Municipal Stormwater Permit
EIM Data Entry Review StatusReviewed
Study TypeMunicipal stormwater permit, outfall monitoring
Study PurposeThe goal of this stormwater characterization monitoring project is to meet the requirements of Section S8.D of the Phase I Municipal Stormwater Permit. The purpose of the permit is to provide Ecology with information on the pollutant loading and average event mean concentrations from representative basins serviced by municipal storm sewer systems. Each basin is to represent a different land use type, so that pollutant export can be correlated with land use within the basins.
Field Collection Date Range9/25/2010 - 10/18/2013
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Water Quality Program, Southwest Region
Ecology ContactChris Montague-Breakwell
Ecology Monitoring Program
Submitting OrganizationPierce County Public Works Surface Water Mgmt - Tacoma WA
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan DescriptionEcology Approved QAPP for S8.D
Study QA Assessment LevelLevel 4: Data Verified and Assessed for Usability in a Formal Study Report
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)