Study ID | WHM_EFF0_P |
Study Name | Watershed Health data for Monitoring the Effectiveness of Pollution Control Activities on Agricultural Lands, Bertrand Creek--Provisional Data |
EIM Data Entry Review Status | Not Reviewed |
Study Type | Habitat monitoring, including Status and Trends monitoring |
Study Purpose | Receive and hold data for each current study year, until data review is complete. Data are then rolled into the WHM_EFF0 study ID. Purpose of WHM_EFF0 study is habitat and biological monitoring to support effectiveness monitoring project on Bertrand Creek. |
Field Collection Date Range | |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Scott Collyard |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | The Washington State Department of Ecology (Ecology) will conduct a pilot study that uses two stations monitored by Ecology’s Freshwater Monitoring Unit to assess the cumulative effects of pollution control measures on several water quality parameters. Specifically, Ecology will employ an upstream/downstream monitoring design in the Bertrand Creek watershed, an agriculturally dominated sub-watershed of the Nooksack River in Whatcom County, Washington. Implementation of pollution control measures and changes in land uses within the treatment area will be tracked over the study period and results will be compared to the upstream monitoring station’s results.
The primary goal of this study is to evaluate changes in several common water quality indicators in relation to implementation of pollution control measures and land use changes in the watershed. The resulting monitoring data will also be used to determine compliance with water quality standards and identify sources of nutrient and pathogen sources over the study period. Also, because implementation and effects of pollution control measures will occur beyond the project study period, a long-term watershed-scale effectiveness monitoring project plan will be developed for the study area. |
Study QA Assessment Level | Level 1: Data neither Verified nor Assessed for Usability |
Study Result Description | |
Study Comment | |
Linked Study | WHM_EFF0 (Same study, but provisional and final data broken into separate EIM studies.)
|
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |