Study ID | RCOO0015 |
Study Name | Albion WWTP PCB and Dieldrin Study |
EIM Data Entry Review Status | Reviewed |
Study Type | Monitoring for NPDES permit requirements |
Study Purpose | Composite influent and effluent samples will be collected over a twenty-four hour period on three occasions during the 2016 discharge season (roughly February through May). The total effluent discharged over the 24 hour sample period will be used to calculate PCB and dieldrin daily loads released to the South Fork Palouse River. |
Field Collection Date Range | 2/9/2016 - 5/3/2016 |
Data First/Last Loaded Date | |
Data Last Updated Date | |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Randy Coots |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | |
Study QA Assessment Level | Level 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report |
Study Result Description | Composite influent and effluent samples will be collected over a twenty-four hour period on three occasions during the 2016 discharge season (roughly February through May). The total effluent discharged over the 24 hour sample period will be used to calculate PCB and dieldrin daily loads released to the South Fork Palouse River. |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | 4728 |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |