Study Details

Study ID:  RCOO0015

Download  Download Study Data

Study Basics

Study IDRCOO0015
Study NameAlbion WWTP PCB and Dieldrin Study
EIM Data Entry Review StatusReviewed
Study TypeMonitoring for NPDES permit requirements
Study PurposeComposite influent and effluent samples will be collected over a twenty-four hour period on three occasions during the 2016 discharge season (roughly February through May). The total effluent discharged over the 24 hour sample period will be used to calculate PCB and dieldrin daily loads released to the South Fork Palouse River.
Field Collection Date Range2/9/2016 - 5/3/2016
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactRandy Coots
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan Description
Study QA Assessment LevelLevel 5: Data Verified and Assessed for Usability in a Peer-Reviewed Study Report
Study Result DescriptionComposite influent and effluent samples will be collected over a twenty-four hour period on three occasions during the 2016 discharge season (roughly February through May). The total effluent discharged over the 24 hour sample period will be used to calculate PCB and dieldrin daily loads released to the South Fork Palouse River.
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID4728
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)