Study ID | EDAI0002 |
Study Name | County Construction Recyclers Landfill Groundwater and Surface Water Assessment Monitoring |
EIM Data Entry Review Status | Reviewed |
Study Type | Landfills – routine monitoring and Solid Waste Management program (SWM) cleanups |
Study Purpose | The County Construction Recyclers (CCR) landfill, located in Everson, Washington, accepted construction and demolition waste under Chapter 173-304 WAC. The eastern and western portions of the CCR landfill were closed around 1997 and 2008, respectively, with low permeability caps and soil layers seeded with grass. The goal of the sampling is to (1) identify if contaminants of concern from the landfill leachate exceed (do not meet) water quality standards, (2) sample when the groundwater table is at its lowest and highest, and (3) confirm groundwater flow direction. |
Field Collection Date Range | |
Data First/Last Loaded Date | ![](../Images/loading.gif) |
Data Last Updated Date | ![](../Images/loading.gif) |
Ecology Program or Other Responsible Entity | Ecy Environmental Assessment Program |
Ecology Contact | Eric Daiber |
Ecology Monitoring Program | |
Submitting Organization | |
Study QA Planning Level | LEVEL 4: Approved QAPP or SAP. |
Study QA Project Plan Description | The goal of the sampling is to (1) identify if contaminants of concern from the landfill leachate exceed (do not meet) water quality standards, (2) sample when the groundwater table is at its lowest and highest, and (3) confirm groundwater flow direction. |
Study QA Assessment Level | Level 1: Data neither Verified nor Assessed for Usability |
Study Result Description | |
Study Comment | |
Linked Study | |
Ecology Funding Number | |
Ecology Facility/Site ID | |
Ecology Cleanup Site ID | |
Recommended QC Blank Censor Factor | |
Study ID Aliases (Alias Type) | |