Study Details

Study ID:  NMAT0009

Download  Download Study Data

Study Basics

Study IDNMAT0009
Study NameSoos Watershed Temp, DO, and Bacteria TMDL - 2023-2024
EIM Data Entry Review StatusNot Reviewed
Study TypeTotal Maximum Daily Load (TMDL) development
Study PurposeConfirm, identify, characterize, and address temperature, DO, and bacteria impairments in the Soos Creek watershed to improve water quality and restore impaired beneficial uses.
Field Collection Date Range4/24/2023 - 4/23/2024
Data First/Last Loaded Date
Data Last Updated Date
Ecology Program or Other Responsible EntityEcy Environmental Assessment Program
Ecology ContactNuri Mathieu
Ecology Monitoring Program
Submitting Organization
Study QA Planning LevelLEVEL 4: Approved QAPP or SAP.
Study QA Project Plan DescriptionData collected throughout the Soos Creek watershed shows that areas of the Soos Creek system do not meet Washington State water quality standards for temperature, dissolved oxygen, and bacteria. The Quality Assurance Project Plan (QAPP) details data collection, analysis, and computer modeling to confirm and address these water quality issues and characterize the sources of the main water quality problems.
Study QA Assessment LevelLevel 1: Data neither Verified nor Assessed for Usability
Study Result Description
Study Comment
Linked Study
Ecology Funding Number
Ecology Facility/Site ID
Ecology Cleanup Site ID
Recommended QC Blank Censor Factor
Study ID Aliases (Alias Type)

Study Data Summary (Record Count or Type)