Violations and Permit Triggers

Use this report to view violations and permit triggers. These include benchmark and limit exceedances on monitoring data, late permit submittals and other violations noted during an inspection. Click the "More Info" link to view more information about the violation/trigger including any related enforcement actions.

In Addition to Dates Please Also Fill in one or more fields and click Search

Example: WAR0011379 or 11379
Look Up Permit Types
Use Region Map

This report includes both permit violations and permit triggers. Permit triggers are not violations but rather when triggered require the permit holder to take an action defined in the permit. Benchmark exceedances and design criteria (85%) exceedances are permit triggers and not permit violations.

If the “is addressed” column in this report states “yes” then Ecology has taken an informal or formal action to address the violation or permit trigger. It does not refer to any action taken by the permit holder. Ecology’s performance goal is to address all permit violations for individual permits. The report includes NA (not applicable) for general permits.

Search Results

Remove the Permit Status = Active filter to view both active and inactive permits.
Filter Search Result
(Permit Status = 'Active')
  • And
  • Or
  • Not And
  • Not Or
  • Contains
  • DoesNotContain
  • StartsWith
  • EndsWith
  • EqualTo
  • NotEqualTo
  • GreaterThan
  • LessThan
  • GreaterThanOrEqualTo
  • LessThanOrEqualTo
  • Between
  • NotBetween
  • IsEmpty
  • NotIsEmpty
  • IsNull
  • NotIsNull
  • Facility Id
  • Violation Id
  • Water Quality name
  • Permit Number
  • Permit Status
  • Permit Type
  • City
  • County
  • Violation Date
  • Is Addressed
  • Category
  • Type
  • Parameter
  • Units
  • Statistical Base
  • Measurement value
  • Benchmark/Limit
  • Violation Notes
  • Violation Override
  • Feature Name
-Facility NamePermit NumberPermit StatusPermit TypeCityCountyViolation DateIs AddressedCategoryTypeParameterUnitsStatistical BaseMeasurement ValueBenchmark/LimitViolation NotesViolation OverrideFeature Name
123
Page size:
 21 items in 3 pages
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing7/1/2024NoReporting ViolationsLate Submittal of DMRs        
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing6/1/2024NoReporting ViolationsLate Submittal of DMRs        
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing4/1/2024NoReporting ViolationsLate Submittal of DMRs        
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing3/1/2024NoReporting ViolationsLate Submittal of DMRs        
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing1/1/2024NoReporting ViolationsLate Submittal of DMRs        
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing1/1/2024NoReporting ViolationsLate Submittal of DMRs     February 2024. Ecology does not routinely issue enforcement actions for those facilities that submit DMRs up to 5 days late. Ecology may consider taking action when facilities repeatedly submit their DMRs late.  
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing12/19/2023N/AReporting ViolationsFailure to submit required report (non-DMR, non-pretreatment)     NFA for late submission of O&M Manual.  
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing12/1/2023NoReporting ViolationsLate Submittal of DMRs     January 2024. Ecology does not routinely issue enforcement actions for those facilities that submit DMRs up to 5 days late. Ecology may consider taking action when facilities repeatedly submit their DMRs late.  
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing10/1/2023NoReporting ViolationsLate Submittal of DMRs     November 2023. Ecology does not routinely issue enforcement actions for those facilities that submit DMRs up to 5 days late. Ecology may consider taking action when facilities repeatedly submit their DMRs late.  
More Info Ellenos Federal Way ST0501341ActiveIndustrial (IU) to POTW/PRIVATE SWDP IPFEDERAL WAYKing10/1/2023NoReporting ViolationsLate Submittal of DMRs     January 2024. Ecology does not routinely issue enforcement actions for those facilities that submit DMRs up to 5 days late. Ecology may consider taking action when facilities repeatedly submit their DMRs late.  
  • NoFilter
  • Contains
  • DoesNotContain
  • StartsWith
  • EndsWith
  • EqualTo
  • NotEqualTo
  • GreaterThan
  • LessThan
  • GreaterThanOrEqualTo
  • LessThanOrEqualTo
  • Between
  • NotBetween
  • IsEmpty
  • NotIsEmpty
  • IsNull
  • NotIsNull
  • Custom