Title | Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 2000 |
||||
|
|||||
VIEW NOW |
Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 2000 (Number of pages: 45) (Publication Size: 535KB)
|
||||
Author(s) | Sargeant, D. | ||||
Description | As part of the Dungeness River and Matriotti Creek bacteria total maximum daily load (TMDL) study, the Washington State Department of Ecology conducted a series of surveys in 1999-2000. This interim report presents data collected during those surveys, including laboratory and field water quality data and flow data from instantaneous flow measurements. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | results, creek, flow, study, basin, river, water, Total Maximum Daily Load | ||||
WATERSHED | Water Resource Inventory Area 18 Elwah-Dungeness | ||||
DATA | Environmental Information Management (EIM) #DSAR0003 |
||||
RELATED PUBLICATIONS | Title:
Dungeness River and Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.