Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Dungeness River and Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study

 
Publication number Date Published
02-03-014May 2002
VIEW NOW Dungeness River and Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study (Number of pages: 78) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Sargeant, D.
Description The Washington State Department of Ecology (Ecology) conducted a total maximum daily load (TMDL) study for fecal coliform bacteria in Matriotti Creek, the lower Dungeness River, and tributaries to Dungeness Bay. Due to nonpoint pollution sources, fecal coliform levels were not meeting freshwater quality standards in Matriotti Creek and not meeting marine water quality standards in Dungeness Bay.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords gold, county, creek, report, study, river, water, Total Maximum Daily Load, tribe, SEPA, fecal coliform, bacteria
WATERSHED Water Resource Inventory Area 18 Elwah-Dungeness
DATA Environmental Information Management (EIM) #DSAR0003

RELATED PUBLICATIONS Title:

Dungeness River and Matriotti Creek Post-Total Maximum Daily Load Data Review

Dungeness Bay Fecal Coliform Bacteria Total Maximum Daily Load Study

Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 2000

Quality Assurance Project Plan: Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study