Title | Quality Assurance Project Plan: Woodland Creek Temperature TMDL |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Woodland Creek Temperature TMDL (Number of pages: 28) (Publication Size: 865KB)
|
||||
Author(s) | Zalewsky, B. | ||||
Description | The purpose of the Woodland Creek temperature study is to characterize mainstem and tributary surface water temperature regimes, channel morphology, hydrology, and streamside vegetation within the watershed. Woodland Creek is a small (29.7 mi2) watershed located in Thurston County, Washington, and is the largest tributary to the Henderson Inlet of Puget Sound. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Henderson Inlet, Woodland, stream, Thurston, county, results, creek, lakes, flow, temperature, model, study, plan, water, quality assurance, quality assurance project plan, quality, wood, TMDL, Puget Sound, lake | ||||
WATERSHED | Water Resource Inventory Area 13 Deschutes | ||||
DATA | Environmental Information Management (EIM) #BZAL0001 |
||||
RELATED PUBLICATIONS | Title:
Henderson Inlet Watershed Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Temperature Total Maximum Daily Load Study |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.