Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Washington State Department of Corrections Washington State Penitentiary Site

 
Publication number Date Published
08-09-027November 2008
VIEW NOW Washington State Department of Corrections Washington State Penitentiary Site (Number of pages: 4) (Publication Size: 318KB)
Note: For more information see related web content below.



Trouble viewing? Try these free options.
Author(s) Carol Bergin
Description The Washington State Department of Ecology plans to enter into an Agreed Order with the Washington State Department of Corrections to conduct a Remedial Investigation and Feasibility Study (RI/FS) at the Washington State Penitentiary site. The site is located at 1313 North 13th Street, in the city of Walla Walla, Washington. Chemicals called volatile organic compounds (VOCs) have been identified in groundwater upgradient of the Sudbury Road landfill outside the prison perimeter fences. The City of Walla Walla has not found these chemicals in the drinking water that supplies the community and the prison. The Public Comment Period is November 19 through December 22, 2008. Public meetings will be held November 19.

Related Web Content: https://fortress.wa.gov/ecy/gsp/Sitepage.aspx?csid=11377
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Sandra Treccani at 509-329-3412
Keywords public comment period, Remedial Investigation, feasibility study, Agreed Order, contamination
FACILITY SITE Facility Site ID: 779

RELATED PUBLICATIONS Title:

WA DOC Washington State Penitentiary: Draft Cleanup Documents Ready for Review and Comment

WA DOC Washington State Penitentiary: Draft Cleanup Documents Ready for Review and Comment

Departamento Correccional del Estado de Washington/Sitio de la Penitenciaria Estatal

Washington State Department of Corrections Washington State Penitentiary Site