Title | Contaminant Loading to the Lower Duwamish Waterway from Suspended Sediment in the Green River |
||||
|
|||||
VIEW NOW |
Contaminant Loading to the Lower Duwamish Waterway from Suspended Sediment in the Green River (Number of pages: 118) (Publication Size: 3MB)
|
||||
Author(s) | Gries, T. and J. Sloan | ||||
Description | To support Lower Duwamish Waterway (LDW) cleanup efforts, total organic carbon (TOC), polychlorinated biphenyls (PCBs), and other contaminants were measured in suspended Green River sediment. Centrifuges and sieves collected samples on seven occasions between July 2008 and January 2009. Contaminants were generally greater than measured in bedded sediments upstream of the LDW but less than indicated by water samples. Fine suspended sediments usually had higher concentrations than sand-sized particles. Daily contaminant loading rates were calculated. Lower and upper bounds for annual loading rates and average concentrations were approximated. These values were sensitive to assumptions about contaminant concentrations during highest streamflows. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Lower Duwamish Waterway, suspended sediment, sampling, contaminant, Green River, cleanup, river, water, loading | ||||
WEB PAGE | Lower Duwamish Waterway | ||||
WATERSHED | Water Resource Inventory Area 09 Duwamish-Green | ||||
DATA | Environmental Information Management (EIM) #LDW_08 |
||||
RELATED PUBLICATIONS | Title:
POSTER: Sediment transport and contaminant loading to the Lower Duwamish Superfund Site from the Green River: Application of innovative sampling technologies to verify model predictions Quality Assurance Project Plan: Loading of Contaminants to the Lower Duwamish Waterway from Suspended Sediments in the Green River |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.