Title | South Fork Palouse River Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan |
||||
|
|||||
VIEW NOW |
South Fork Palouse River Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan (Number of pages: 70) (Publication Size: 1MB)
|
||||
Author(s) | Elaine Snouwaert | ||||
Description | This implementation plan expands on the recommendations in the South Fork Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report (09-10-060), and lays out the roles and responsibilities for addressing fecal coliform bacteria in the watershed. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Elaine Snouwaert at 509-329-3503 | ||||
Keywords | water quality improvement report, implementation plan, water quality, watershed, Total Maximum Daily Load, fecal coliform, bacteria | ||||
WEB PAGE | Water Quality Improvement Project: South Fork Palouse River: Multi-parameter | ||||
WATERSHED | Water Resource Inventory Area 34 Palouse |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.