Title | Quality Assurance Project Plan: Sammamish River Temperature and Dissolved Oxygen Total Maximum Daily Load Study Design |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Sammamish River Temperature and Dissolved Oxygen Total Maximum Daily Load Study Design (Number of pages: 111) (Publication Size: 3013KB)
|
||||
Author(s) | Mohamedali, T., K. Sinclair, and M. Rosewood-Thurman | ||||
Description | This is the project plan for the Sammamish River Temperature and Dissolved Oxygen Total Maximum Daily Load Study Design. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Teizeen Mohamedali at 360-715-5209 or teizeen.mohamedali@ecy.wa.gov | ||||
Keywords | Sammamish River, temperature, quality assurance project plan, TMDL, dissolved oxygen, HUC: 17110012 | ||||
WATERSHED | Water Resource Inventory Area 08 Cedar-Sammamish | ||||
DATA | Environmental Information Management (EIM) #mros0001 |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.