Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Olequa Creek, Dry Season Flow Characterization in Winlock, WA, Lewis County

 
Publication number Date Published
15-10-021June 2015
VIEW NOW Quality Assurance Project Plan: Olequa Creek, Dry Season Flow Characterization in Winlock, WA, Lewis County (Number of pages: 25) (Publication Size: 877KB)




Trouble viewing? Try these free options.
Author(s) Dickes, Betsy
Description Low summer flow in Olequa Creek may not provide enough dilution for the wastewater treatment plant (WWTP) to meet its water quality-based effluent limits for temperature and copper. Ecology staff will measure streamflow in Olequa Creek during the months May through October to characterize streamflow conditions during low flow conditions.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Betsy Dicks at 360-407-6296 or Betsy.Dickes@ecy.wa.gov
Keywords streamflow, wastewater treatment plant, quality assurance project plan
WEB PAGE WRIA 26 - Cowlitz
WATERSHED Water Resource Inventory Area 26 Cowlitz
WATER QUALITY PERMIT Water Quality Permit ID: WA0021199

DATA Environmental Information Management (EIM) #BEDI0023