Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Hangman Creek Dissolved Oxygen, pH, and Nutrients Pollutant Source Assessment

 
Publication number Date Published
17-03-111May 2017
VIEW NOW Quality Assurance Project Plan: Hangman Creek Dissolved Oxygen, pH, and Nutrients Pollutant Source Assessment (Number of pages: 76) (Publication Size: 2455KB)




Trouble viewing? Try these free options.
Author(s) Albrecht, A., T. Stuart, and Melanie Redding
Description This the project plan for the study, Hangman Creek Dissolved Oxygen, pH, and Nutrients Pollutant Source Assessment.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Tighe Stuart at 509-329-3476 or tist461@ecy.wa.gov
Keywords Hangman Creek, nitrogen, model, Spokane River, quality assurance project plan, water quality, watershed, pH, phosphorus, nutrient, dissolved oxygen
WATERSHED Water Resource Inventory Area 56 Hangman
DATA Environmental Information Management (EIM) #tist0002

RELATED PUBLICATIONS Title:

Hangman Creek Watershed Nutrients and Sediment Pollutant Source Assessment

Tekoa Wastewater Treatment Plant Dissolved Oxygen, pH, and Nutrients Receiving Water Study

Hangman Creek Watershed Dissolved Oxygen, pH, and Nutrients Total Maximum Daily Load Study: Data Summary Report

Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report

Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design