Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

BNSF Railway Black Tank Property: Ecology invites public input on the draft Remedial Investigation and Feasibility Study

DRAFT FOR PUBLIC COMMENT Comment on this draft
 
Publication number Date Published
17-09-023May 2017
VIEW NOW BNSF Railway Black Tank Property: Ecology invites public input on the draft Remedial Investigation and Feasibility Study (Number of pages: 4) (Publication Size: 1678KB)




Trouble viewing? Try these free options.
Author(s) Erika Bronson
Description The Washington State Department of Ecology seeks your input on the draft Remedial Investigation and Feasibility Study (RI/FS) for the BNSF Railway Black Tank Property May 22 through June 22, 2017. The RI documents the extent and locations of petroleum contamination in soil and groundwater at the site. The FS evaluates cleanup options.

The site housed a 50-foot-diameter, above-ground black tank that stored petroleum products, primarily the thick, heavy oil known as bunker C for fueling trains. Today, there are five areas of soil contamination ranging from the surface to 15 feet underground. From 15 feet underground to the water table, a 9,150-square-foot area of soil is contaminated. This is the pathway through which the petroleum traveled from the surface to groundwater. As a result, an approximate 7-acre plume of petroleum rests on groundwater about 170 feet underground.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Erika Bronson at 509-359-3546 or erika.bronson@ecy.wa.gov
Keywords cleanup options, Model Toxics Control Act (MTCA), Remedial Investigation, feasibility study, soil, petroleum, groundwater, contamination
WEB PAGE BNSF Railway Black Tank Property cleanup site information
CLEANUP SITE Cleanup Site ID: 3243

FACILITY SITE Facility Site ID: 98615712

RELATED PUBLICATIONS Title:

BNSF Railway Black Tank Property: Public invited to comment on draft Cleanup Action Plan and supporting documents

BNSF Railway Black Tank Property Cleanup

Frequently Asked Questions: BNSF Railway Black Tank Property

BNSF Railway Black Tank Site