| Title | Quality Assurance Project Plan Icicle Creek Synoptic Flow Study |
||||
|
|||||
| VIEW NOW |
Quality Assurance Project Plan Icicle Creek Synoptic Flow Study (Number of pages: 112) (Publication Size: 6209KB)
|
||||
| Author(s) | OCR | ||||
| Description | This Quality Assurance Project Plan (QAPP) for the Icicle Creek Synoptic Flow Study (Study) outlines procedures for performing a synoptic flow study on Icicle Creek located near Leavenworth in Chelan County, Washington. This QAPP was generally prepared in accordance with the Washington State Department of Ecology’s (Ecology’s) Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies (Ecology 2004) and Quality Management Plan Version 5 (Ecology 2020). |
||||
| REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
| Contact | Tim Poppleton at 509-480-1469 or tim.poppleton@ecology.wa.gov | ||||
| Keywords | Chelan, Office of Columbia River, QAPP, Leavenworth, OCR, Icicle Creek, Icicle Creek Strategy, Synoptic Flow |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.