Title | Colville Wastewater Treatment Plant Class II Inspection September 22-23, 1987 |
||||
|
|||||
VIEW NOW |
Colville Wastewater Treatment Plant Class II Inspection September 22-23, 1987 (Number of pages: 30) (Publication Size: 1MB)
|
||||
Author(s) | Heffner, M. | ||||
Description | A Class II inspection was conducted at the Colville Wastewater Treatment Plant on September 22 and 23, 1987. The WTP is a three-cell lagoon system discharging into the Colville River. The plant was meeting the BOD5 and TSS limits set forth in Docket No. DE-77-281 which relaxes the NPDES permit limits (#WA-002261-6). Metals concentrations in the plant discharge were below toxicity concentration criteria. Plans to remove sludge from the first lagoon cell should be developed and executed in the near future. Improved flow measurement is also recommended. | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Colville River, wastewater treatment plant, toxicity, metals, flow, river, NPDES | ||||
WATERSHED | Water Resource Inventory Area 59 Colville |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.