Publications Home



Quality Assurance Project Plans (QAPPs) (578 publications 1994-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1995 · 1994 ·

Title (link to summary)NumberDate (released or updated)
Quality Assurance Project Plan: Feasibility of using Sediment Profile Imaging Technology to Evaluate Sediment Quality and Impacts to Benthic Communities found at two Contaminated Sediment Cleanup Sites in the Puget Sound. 06-03-119December 2006
Quality Assurance Project Plan: Using Sediment Profile Imaging (SPI) to Evaluate Sediment Quality at Two Puget Sound Cleanup Sites: Part II: Port Gamble Bay 06-03-117December 2006
Quality Assurance Project Plan: Using Sediment Profile Imaging (SPI) to Evaluate Sediment Quality at Two Puget Sound Cleanup Sites: Part I - Lower Duwamish Waterway 06-03-116December 2006
Quality Assurance Project Plan: Puyallup River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Study 06-03-115December 2006
Quality Assurance Project Plan: PCB Monitoring at Walla Walla Wastewater Treatment Plants 06-03-114October 2006
Sampling and Analysis Plan and Quality Assurance Project Plan: Green River and Newaukum Creek Temperature and Dissolved Oxygen Study 06-03-110October 2006
Addendum to Quality Assurance Project Plan: Montesano Groundwater Investigation of Leaking Underground Storage Tank Sites 04-03-114ADDOctober 2006
Addendum to Quality Assurance Project Plan: Pend Oreille River Temperature TMDL 04-03-109ADDOctober 2006
Quality Assurance Project Plan: South Fork Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Study 06-03-112September 2006
Quality Assurance Project Plan: Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish - 2006: Assessing Progress Toward TMDL Targets and Updating the Fish Consumption Advisory 06-03-111September 2006
Quality Assurance Project Plan: Measuring Copper Concentrations in Two Puget Sound Marinas 06-03-109September 2006
Sampling and Analysis Plan and Quality Assurance Project Plan: Bear/Evans Watershed Temperature and Dissolved Oxygen Total Maximum Daily Load Study 06-03-107September 2006
Quality Assurance Project Plan: Puyallup and White Rivers Temperature and Dissolved Oxygen Monitoring 06-03-204August 2006
Quality Assurance Project Plan: Old Stillaguamish River Multi-Parameter Total Maximum Daily Load Study 06-03-108August 2006
Quality Assurance Project Plan: Snoqualmie River Temperature Total Maximum Daily Load Study 06-03-106July 2006
Addendum to Quality Assurance Project Plan: Shelton Laundry and Cleaners. 02-03-078ADDJuly 2006
Quality Assurance Project Plan: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study 06-03-105June 2006
Quality Assurance Project Plan: South Fork Palouse River Temperature Total Maximum Daily Load Study 06-03-104June 2006
Quality Assurance Project Plan: Measuring Mercury Trends in Freshwater Fish in Washington State 06-03-103April 2006
Quality Assurance Project Plan: Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load Study 06-03-102March 2006
Addendum to Quality Assurance Project Plan for Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams: Addition of Skagit-Samish Watersheds, and Extension of Program through June 2009. 03-03-104ADDMarch 2006
Quality Assurance Project Plan: Willapa River Fecal Coliform Bacteria Verification Study 06-03-202February 2006
Quality Assurance Project Plan: Lake Ballinger Total Maximum Daily Load Effectiveness Monitoring Study 06-03-201January 2006