Publications Home



Quality Assurance Project Plans (QAPPs) (578 publications 1994-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1995 · 1994 ·

Title (link to summary)NumberDate (released or updated)
Quality Assurance Project Plan: Little Spokane River Fish Hatchery, Water Quality Monitoring for Nutrients 08-03-120December 2008
Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment 08-03-119December 2008
Quality Assurance Project Plan: Goosmus Creek Metals and Conventional Parameters Water Quality Monitoring 08-03-118November 2008
Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design 08-03-117October 2008
Quality Assurance Project Plan: Screening for Blue-Green Algae Toxins in Lake Fish Tissues. 08-03-116October 2008
Focus on: Side-by-Side River and Stream Sampling Program 08-03-028October 2008
Quality Assurance Project Plan: High-resolution, Pore-water Sampling Near the Groundwater/Surface Water Interface 08-03-115September 2008
Quality Assurance Project Plan: Loading of Contaminants to the Lower Duwamish Waterway from Suspended Sediments in the Green River 08-03-114September 2008
Quality Assurance Project Plan: Receiving Water Study for Puget Sound Boatyards: Metals Translators and Hardness 08-03-108September 2008
Addendum to Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load 08-03-105ADD1September 2008
Quality Assurance Project Plan: Pharmaceuticals and Personal Care Products in Wastewater Treatment Systems 08-03-112August 2008
Quality Assurance Project Plan: Evaluation of Candidate Freshwater Sediment Reference Sites 08-03-111July 2008
Quality Assurance Project Plan: Union River Fecal Coliform Total Maximum Daily Load Effectiveness Monitoring 08-03-109July 2008
Addendum to Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies 07-03-103ADD1June 2008
Quality Assurance Project Plan: PBT Monitoring: Measuring Perfluorinated Compounds in Washington Rivers and Lakes 08-03-107May 2008
Quality Assurance Project Plan: Lead and Copper Concentrations In North Creek, Gig Harbor 08-03-106May 2008
Addendum #1 to Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program 07-03-104ADD1May 2008
Addendum #1 to Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores. 06-03-113ADD1May 2008
Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load: Phase 1 Water Quality Study Design 08-03-105March 2008
Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load 08-03-104February 2008
Quality Assurance Project Plan: Surface Sediment and Fish Tissue Chemistry in Greater Elliott Bay (Seattle) 08-03-103February 2008
Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Dobbs Creek 08-10-009January 2008
Quality Assurance Project Plan: PCB and Dioxin Levels in Resident Fish from Washington Background Lakes and Rivers 08-03-102January 2008