Title (link to summary) | Number | Date (released or updated) |
Quality Assurance Project Plan: Little Spokane River Fish Hatchery, Water Quality Monitoring for Nutrients
| 08-03-120 | December 2008 |
Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment
| 08-03-119 | December 2008 |
Quality Assurance Project Plan: Goosmus Creek Metals and Conventional Parameters Water Quality Monitoring
| 08-03-118 | November 2008 |
Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design
| 08-03-117 | October 2008 |
Quality Assurance Project Plan: Screening for Blue-Green Algae Toxins in Lake Fish Tissues.
| 08-03-116 | October 2008 |
Focus on: Side-by-Side River and Stream Sampling Program
| 08-03-028 | October 2008 |
Quality Assurance Project Plan: High-resolution, Pore-water Sampling Near the Groundwater/Surface Water Interface
| 08-03-115 | September 2008 |
Quality Assurance Project Plan: Loading of Contaminants to the Lower Duwamish Waterway from Suspended Sediments in the Green River
| 08-03-114 | September 2008 |
Quality Assurance Project Plan: Receiving Water Study for Puget Sound Boatyards: Metals Translators and Hardness
| 08-03-108 | September 2008 |
Addendum to Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load
| 08-03-105ADD1 | September 2008 |
Quality Assurance Project Plan: Pharmaceuticals and Personal Care Products in Wastewater Treatment Systems
| 08-03-112 | August 2008 |
Quality Assurance Project Plan: Evaluation of Candidate Freshwater Sediment Reference Sites
| 08-03-111 | July 2008 |
Quality Assurance Project Plan: Union River Fecal Coliform Total Maximum Daily Load Effectiveness Monitoring
| 08-03-109 | July 2008 |
Addendum to Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies
| 07-03-103ADD1 | June 2008 |
Quality Assurance Project Plan: PBT Monitoring: Measuring Perfluorinated Compounds in Washington Rivers and Lakes
| 08-03-107 | May 2008 |
Quality Assurance Project Plan: Lead and Copper Concentrations In North Creek, Gig Harbor
| 08-03-106 | May 2008 |
Addendum #1 to Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program
| 07-03-104ADD1 | May 2008 |
Addendum #1 to Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores.
| 06-03-113ADD1 | May 2008 |
Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load: Phase 1 Water Quality Study Design
| 08-03-105 | March 2008 |
Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load
| 08-03-104 | February 2008 |
Quality Assurance Project Plan: Surface Sediment and Fish Tissue Chemistry in Greater Elliott Bay (Seattle)
| 08-03-103 | February 2008 |
Quality Assurance Project Plan: Water Quality Monitoring for Fecal Coliform Bacteria in Dobbs Creek
| 08-10-009 | January 2008 |
Quality Assurance Project Plan: PCB and Dioxin Levels in Resident Fish from Washington Background Lakes and Rivers
| 08-03-102 | January 2008 |