Chevron Bulk Plant USA 1348

Facility Site ID: 1234
Cleanup Site ID: 3762

Site Description

The Chevron Bulk Plant 1328 site (formerly known as Bowman Oil & Propane) is generally located at 1656 East J Street in Tacoma, in the Tacoma Tideflats.  It is in an industrial area, near the Tacoma Tarpits Superfund site.  Standard Oil Company (now Chevron U.S.A. Inc.) purchased the property around 1905 and used it as a bulk fuel plant until 1988.  Bulk fuel plants are facilities that receive and distribute petroleum products.  This facility had a number of above and below ground storage tanks, which held gasoline, diesel, fuel oil, aviation fuel, stove and furnace soils, and additives.
 
In 1984, Standard Oil Company found groundwater contamination, including petroleum hydrocarbons, and benzene,toluene,ethylbenzene, andxylene.  In the early 1990s, Chevron tried to clean up the groundwater, but, testing in 1992 still showed petroleum-related contamination in groundwater.  Soil testing in 1992 found additional contamination—lead and polynuclear aromatic hydrocarbons. 
 
In 2001, Chevron removed around 58 tons of petroleum-contaminated soils and disposed of them off-site.  Chevron has tried several methods for clean up the remaining soils, but contamination is still above state cleanup levels.  They are now working on a new cleanup approach. 

Public Involvement Opportunities

Ecology wants to keep you involved!  You will have the chance to review and comment on key documents during the investigation and cleanup process.  Documents can be found at this website and at repository locations listed to the right. 
Legal 6
Document Title Document Date Document Type
Agreed Order No. DE 7111 3/1/2010 Agreed Order
Final PLP Determination - Cornerstone Property Investments 9/2/2009 Final Potentially Liable Person Status Letter
Final PLP Determination - Chevron USA 8/25/2009 Final Potentially Liable Person Status Letter
Final PLP Determination - Chevron Environmental Management Co 8/24/2009 Final Potentially Liable Person Status Letter
Preliminary PLP Determination - Chevron Environmental Management Co 7/21/2009 Final Potentially Liable Person Status Letter
Preliminary PLP Determination - Cornerstone Property Investments 7/21/2009 Final Potentially Liable Person Status Letter
Outreach Information 3
Document Title Document Date Document Type
Responsiveness Summary - Agreed Order No. DE 7111 2/10/2010 Responsiveness Summary
Fact Sheet - Agreed Order No. DE 7111 1/4/2010 Fact Sheet\Public Notices
Public Participation Plan - October 2009 10/1/2009 Public Participation Plan
Technical Reports 18
Document Title Document Date Document Type
2024 Fourth Quarter Groundwater Monitoring Report 1/6/2025 Monitoring Report
Revised Remedial Investigation Work Plan Amendment 8/28/2024 Remedial Investigation Work Plan
Chevron Bulk Plant USA 1348 Updated Draft Remedial Investigation & Data Gaps Report 8/22/2024 Remedial Investigation Report
First Quarter 2024 Groundwater Monitoring Report 5/10/2024 Monitoring Report
Draft Remedial Investigation and Data Gaps Report 4/23/2024 Remedial Investigation Report
4th Quarter/Annual 2023 Monitoring Report 3/8/2024 Monitoring Report
Former Chevron Bulk Terminal Tacoma - Change of Contact Form 7/10/2023 Site Specific Administrative Document - Other (Administrative Correspondence)
Chevron Bulk Plant 1348 - Cleanup Site Remedial Investigation Schedule 6/27/2023 Site Specific Administrative Document - Other (Administrative Correspondence)
Chevron Bulk Plant 1348 - Site Manager Change 5/2/2023 Site Specific Administrative Document - Other (Administrative Correspondence)
Chevron Bulk Plant USA 1348 8/15/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Project Coordinator Letter 3/29/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Final - Supplemental RI Work Plan Addendum 3/20/2018 Remedial Investigation Work Plan
Supplemental RI Work Plan Approval Letter 7/5/2017 Site Specific Administrative Document - Other (Administrative Correspondence)
Final - Supplemental RI Work Plan 5/26/2017 Remedial Investigation Work Plan
Final - Tidal Survey Work Plan 8/24/2016 Remedial Investigation Work Plan
Site Manager Change 11/3/2015 Site Specific Administrative Document - Other (Administrative Correspondence)
Agency Review Draft - RI Report 12/15/2014 Remedial Investigation Report
Chevron Bulk Plant USA 1348 - Site Hazard Assessment 8/18/2008 Site Hazard Assessment Report
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 8

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Metals - Metals Priority Pollutants S S
Non-Halogenated Organics - Petroleum Products-Unspecified C C S S
Non-Halogenated Organics - Non-Halogenated Solvents C C
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons S S
Non-Halogenated Organics - Benzene C C
Non-Halogenated Organics - Petroleum-Diesel C C
Non-Halogenated Organics - Petroleum-Gasoline C C
Non-Halogenated Organics - Petroleum-Other C C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.