Port Orchard Bulk Plant & Cardlock
Status Update
The Site was cleaned up under the Puget Sound Initiative. The Puget Sound Initiative provides financial support for cleanups bordering Puget Sound waterways. This site was in the Voluntary Cleanup Program.
Ecology issued a No Further Action Letter for the Site in 2013.
A Puget Sound Initiative Site - Reaching The Goal Of A Healthy, Sustainable Puget Sound.
Environmental Covenant
In 2013, an environmental covenant (EC) was filed with King County and placed on the Site to protect the human health and environment. The EC restricts certain uses of the Site so that humans and the environment are not exposed to contamination that had to be left on the property. Contaminated soil could not be removed since it was inaccessible below utilities. To ensure that the asphalt cap remains intact and contamination is not exposed, activities like drilling, digging, removing existing buildings or pavement, and placement of any objects that would deform the surface is prohibited with Ecology’s approval.
Site Background
The area comprising the Site was used as a bulk fuel storage facility, first as the Wilkins Distributing Bulk Plant and Cardlock by Wilkins Distributing Company/Nordic Properties from the 1940s to 1992, then as the Gull Industries Port Orchard Bulk Plant and Cardlock between 1993 and 2003.
The former fuel storage facility on the property used both aboveground and underground storage tanks (ASTs/USTs) for the storage and distribution of gasoline and diesel fuel. Eight ASTs installed between 1965 and 1989 on the western portion of the Site were removed in early 2004.
Currently, the property comprising the Site is surfaced with gravel. It operates as a recreational vehicle sales facility.
What Was Done To Clean Up The Site?
Cleanup at the Site was began in 2004. A total of 10 USTs were removed, and 5,593 tons of contaminated soil from two excavations were transported off-Site for disposal. Groundwater was monitored to evaluate how removing contaminated soil improved groundwater quality.
More cleanup actions at the Site happened in several phases between 2007 and 2009, and included the following activities:
· Two separate chemical injections to treat non-excavated soil at the Site
· Excavation of the remainder of a historic gasoline pipe which connected the two soil excavation sites
· Additional soil sampling
· Groundwater monitoring
Soil samples from the two excavation sites and groundwater samples collected after the cleanups action was completed found contaminant levels to be below acceptable levels. Two areas along the border of the first excavation site, where higher residual levels of contaminants remain and could not be removed, have been capped by asphalt pavement in order to prevent further risk to humans or the surrounding environment.
Contaminants Of Concern
Soil and groundwater are contaminated with the following:
- Gasoline-range petroleum hydrocarbons (GRPHs)
- Diesel-range petroleum hydrocarbons (DRPHs)
- Benzene, toluene, ethylbenzene and total xylenes (BTEX)
Model Toxics Control Act
The Model Toxics Control Act (MTCA) is Washington’s environmental cleanup law. It provides requirements for contaminated site cleanup and sets standards that protect human health and the environment. Ecology implements the law and oversees cleanups.
The MTCA site cleanup process is completed in steps over a variable timeline.
Learn How Ecology Is Protecting The Environment In Your Community
What's In My Neighborhood shows contamination cleanup sites in Washington state. Ecology encourages cleanup of these sites to protect the health of people, plants, and animals. Cleanups are projects that remove, treat, or contain potentially harmful substances.
Report An Environmental Issue
To report an environmental problem or concern, any time, day or night, use the online reporting form.
Counties: Island, King, Kitsap, San Juan, Skagit, Snohomish, and Whatcom
Email: nwroerts@ecy.wa.gov
Phone: 206-594-0000
Voluntary Cleanup Program
This site was cleaned up under our Voluntary Cleanup Program, which provides technical help to owners of contaminated sites.
Voluntary Cleanup Program customers pay fees to cover our costs for technical help and reviewing cleanup reports. Sites in this program must meet the same cleanup standards as the sites Ecology manages under legal orders.
Site use restrictions called institutional controls are in effect
Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.
Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Institutional Controls 1
Environmental Covenant
Restrictions/Requirements
- Ongoing Maintenance of Remedy
- Prevent the Reuse or Relocation of Site Soil
- Prohibit New Building Construction
- Prohibit Removal or Alteration of Existing Buildings
- Prohibit Soil Disturbance
Restricted Media
- Soil
Documents 9
Legal 1
| Document Title | Document Date | Document Type |
| Port Orchard Bulk Plant & Cardlock - Environmental Covenant | 7/3/2013 | Environmental Covenant; Alternative Mechanism |
Outreach Information 1
| Document Title | Document Date | Document Type |
| Port Orchard Bulk Plant & Cardlock - Fact Sheet April 2013 | 4/15/2013 | Fact Sheet\Public Notices |
Technical Reports 5
| Document Title | Document Date | Document Type |
| Feasibility Study and Disproportionate Cost Analysis | 4/17/2012 | Feasibility Study |
| Addendum - Closure Report | 5/3/2011 | Site Specific Technical Document - Other |
| Port Orchard Bulk Plant & Cardlock - Closure Report October 2010 | 10/4/2010 | Site Specific Technical Document - Other |
| Port Orchard Bulk Plant & Cardlock - Site Hazard Assessment | 3/21/2003 | Site Hazard Assessment Report |
| Port Orchard Bulk Plant & Cardlock - SHA Notification Letter | 2/21/2003 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Voluntary Cleanup Program 2
| Document Title | Document Date | Document Type |
| Port Orchard Bulk Plant & Cardlock - VCP No Further Action Letter | 7/9/2013 | VCP Opinion on Site Cleanup – NFA |
| Port Orchard Bulk Plant & Cardlock - VCP Further Action letter | 5/19/2011 | VCP Opinion on Site Cleanup – Other |
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
Contaminants 6
| Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
|---|---|---|---|---|---|---|
| Non-Halogenated Organics - Petroleum Products-Unspecified | S | S | ||||
| Non-Halogenated Organics - Non-Halogenated Solvents | C | C | S | |||
| Non-Halogenated Organics - Benzene | C | C | ||||
| Non-Halogenated Organics - Petroleum-Diesel | C | C | ||||
| Non-Halogenated Organics - Petroleum-Gasoline | C | C | ||||
| Non-Halogenated Organics - Petroleum-Other | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated