Cleanup Process Moves Toward Remedial Investigation and Feasibility Study
On June 22, 2020, Ecology started a 30-day comment period on an agreed order (legal agreement) and a public participation plan for the Chevron 97502 cleanup site (Site). We also hosted an online public meeting on June 30, 2020. (Download Public Meeting Presentation PDF)
The Site is located at the corner of Ferry and Metcalf Streets in downtown Sedro-Woolley, WA. The City of Sedro-Woolley (City) currently owns the Site property. Chevron USA Inc. (Chevron) operated a service station at the Site from 1950 until 1991.
The legal agreement between Ecology, the City, and Chevron will require the City and Chevron to evaluate cleanup options and create a cleanup plan. A future legal agreement will require the City and Chevron to design and carry out the work described in the cleanup plan.
Ecology has reviewed and considered all comments received and has finalized the Agreed Order and the Public Participation Plan - informed by these public comments. Work will then begin as outlined in the Agreed Order Scope of Work and Schedule of Deliverables.
En español El Departamento de Ecología le invita a revisor y comentar acerca de los documentos para el sitio que está contaminado Chevron 97502 en Sedro-Woolley. Si le gustaría recibir este documento en español, por favor llame al 509-329-3444 o envíe un correo electrónico a preguntas@ecy.wa.gov. Traducciones de avisos públicos para este sitio de limpieza se preparan bajo solicitud. |
General Cleanup Process
Estimated Site Timeline
- June 22 – July 21, 2020: Held a 30-day public comment period.
- June 30, 2020: Hosted an online public meeting. (Download Public Meeting Presentation PDF)
- 2020: Respond to comments, finalize documents, and begin remedial investigation/feasibility study.
Public Participation
This plan includes information for the public regarding opportunities to get involved in the cleanup process. The outreach activities and mechanisms presented reflect Ecology’s current plans for keeping the public informed and for receiving information and comments from the public.
Site Information
Location and background
The Chevron 97502 property is located at the northwest corner of Ferry and Metcalf streets in downtown Sedro-Woolley. The 0.21 acre property is currently owned by the City and has been in use as Hammer Heritage Park since 2005. The park is paved with concrete pavers and contains a gazebo, planters, and public restrooms. The park is the location of the Sedro-Woolley Farmers Market and other community events.
A gas station operated on the property from 1950 until 1991. Six underground storage tanks and three fuel pump islands were removed between 1991 and 1992 when the gas station was decommissioned.
Contamination
Past environmental investigations showed petroleum contamination in soil and groundwater that exceeded cleanup levels allowed under the Model Toxics Control Act (MTCA):
- Gasoline and diesel-range hydrocarbons
- Benzene, toluene, ethylbenzene, and xylene (BTEX)
Previous cleanup work
As a part of the Site’s 1992 underground storage tank decommissioning, approximately 1,800 cubic yards of contaminated soil were removed from the Site. Testing in 2007 found light non-aqueous phase liquid (LNAPL or petroleum products that float on top of groundwater). Approximately 1,500 gallons of contaminated groundwater were removed by vacuum truck. A 2008 soil vapor investigation found soil vapor levels were below MTCA levels of concern. Groundwater was treated in 2009 and approximately 560 gallons of contaminated liquid were removed. Routine groundwater monitoring in 2013-2014 found that contaminated groundwater beneath the Site remains above MTCA cleanup levels established to protect human health and the environment
Key Documents
Documents 34
Legal 5
Document Title | Document Date | Document Type |
Chevron 97502 - Final Agreed Order - September 2020 | 9/14/2020 | Agreed Order |
Chevron 97502 - Expectations Letter - Chevron | 6/12/2018 | Agreed Order |
Chevron 97502 - Expectations Letter - City of Sedro Woolley | 6/12/2018 | Agreed Order |
Chevron 97502 - PLP Status Letter to City of Sedro-Woolley | 4/27/2016 | Final Potentially Liable Person Status Letter |
Chevron 97502 - PLP Status Letter to Chevron | 2/22/2016 | Final Potentially Liable Person Status Letter |
Public Information 4
Document Title | Document Date | Document Type |
Chevron 97502 - Final Public Participation Plan - August 2020 | 8/21/2020 | Public Participation Plan |
Chevron 97502 - Response to Comments - Agreed Order, Public Participation Plan - August 2020 | 8/21/2020 | Responsiveness Summary |
Chevron 97502 - Online Public Meeting Presentation - June 30, 2020 | 6/30/2020 | Multimedia |
Chevron 97502 - Fact Sheet: Agreed Order, Public Participation Plan - June 2020 | 6/15/2020 | Fact Sheet\Public Notices |
Technical Reports 24
Document Title | Document Date | Document Type |
97502 Remedial Investigation Report_Draft_07152022_wAppendices | 7/15/2023 | Remedial Investigation Report |
Chevron 97502 Sedro Woolley - Status Update_07142023 | 7/14/2023 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update_04172023 | 4/17/2023 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update_01132023 | 1/13/2023 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update 10/14/2022 | 10/14/2022 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update_07-14-2022 | 7/14/2022 | Progress Report |
Chevron 97502 HartCrowser HAR014 Period 01-23-21 through 06-30-22 | 6/30/2022 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update 04-14-2022 | 4/14/2022 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update_01142022 | 1/14/2022 | Progress Report |
Chevron 97502 Sedro Woolley - Hammer Heritage Square - Status Update 01142022 | 1/14/2022 | Site Specific Technical Document - other |
Chevron 97502 Sedro Woolley - Status Update _10082021 | 10/8/2021 | Progress Report |
Chevron 97502 Sedro Woolley - Status Update_07152021 | 7/15/2021 | Progress Report |
RI Work Plan | 5/20/2021 | Remedial Investigation Work Plan |
Chevron 97502 Sedro Woolley - Status Update 04152021 | 4/15/2021 | Progress Report |
Ecology Change of Project Coordinator | 12/13/2018 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron Change of Contact Notice 09-10-2018 | 9/10/2018 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - SHA Rank Letter (Chevron) | 2/21/2018 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - SHA Rank Letter (Sedro-Woolley) | 2/21/2018 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - Site Hazard Assessment | 2/20/2018 | Site Hazard Assessment Report |
Chevron 97502 - SHA Notification Letter (Chevron) | 1/29/2018 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - SHA Notification Letter (Sedro-Woolley) | 1/29/2018 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - Notice of Potential Liability Letter for the City of Sedro-Woolley | 2/22/2016 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - Notice of Potential Liability Letter for Chevron | 10/1/2015 | Site Specific Administrative Document - other (Administrative correspondence) |
Chevron 97502 - Groundwater Monitoring Report | 3/19/1999 | Groundwater Monitoring Report |
Voluntary Cleanup Program 1
Document Title | Document Date | Document Type |
Chevron 97502 - VCP Status Request Letter | 1/13/2010 | VCP Administrative Document |
Places to see print documents
-
Ecology Bellingham Field Office913 Squalicum Way, Unit 101Bellingham, 98225This location may only have print documents available during open comment periods.
Contaminants 4
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Non-Halogenated Organics - Non-Halogenated Solvents | C | C | ||||
Non-Halogenated Organics - Benzene | C | C | ||||
Non-Halogenated Organics - Petroleum-Diesel | C | C | ||||
Non-Halogenated Organics - Petroleum-Gasoline | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below