USG Interiors Inc Puyallup
Current Status
Ecology held a public comment period for the USG Interiors, LLC Puyallup site between January 7 and February 5, 2019. The following documents were available for public comment:
- Remedial Investigation (RI) and Feasibility Study (FS) that describe the contamination and compares cleanup options.
- Cleanup Action Plan (CAP) that outlines the cleanup action selected by Ecology.
- Agreed Order DE#11098 that requires USG to implement and maintain the recommended cleanup actions.
- State Environmental Policy Act (SEPA) Checklist and Determination of Non-Significance (DNS) that describe the potential environmental impacts of the cleanup work.
Ecology responded to the two comments we received.
Site Description
The site is located at 1005 River Road East between River Road and the Puyallup River. It is 1.58 acres and consists of four USG-owned tax parcels that include portions of the Bonney Lake Used Cars property to the west, Market Place Auto property to the east, and Pierce County’s Inter-County River Improvement Right-of-Way along the Puyallup River to the north. The Riverwalk Trail, a paved path at the top of the river bank, is used for biking and walking. Currently, there are no plans for future land use at the site.
Prior to 1971, the USG facility used slag from the former Tacoma Asarco copper smelter as a raw material to produce rock wool. Rock wool is an insulating and fire-proofing material. It is made by heating rock until it is molten, and blowing or spinning it into fine fibers. The manufacturing waste that consisted of “baghouse dust” and “shot”, was used as fill on the site to raise the grade. In the 1980s, USG learned that the slag and waste contained high concentrations of arsenic, and had contaminated soil, sediments in the Puyallup River, and groundwater.
In 1984, USG entered into an Agreed Order to assess groundwater contamination on the site. Between 1984 and 1985, USG removed contaminated soil and disposed of it at a hazardous materials landfill. Ecology required USG to monitor the groundwater after the cleanup.
In 2006, USG conducted a site assessment and found soil and groundwater with arsenic concentrations above the state Model Toxics Control Act (MTCA) cleanup levels. In 2007, USG conducted a Remedial Investigation (RI) and Feasibility Study (FS). Now, Ecology and USG are proposing to implement the Cleanup Action Plan (CAP) to address the remaining contamination.
Documents 26
Legal 8
Document Title | Document Date | Document Type |
Agreed Order No. DE 11098 | 4/11/2019 | Agreed Order |
2018.02.12_USG Interiors Inc. Puyallup_Final Determination of Liability_Status Letter | 2/12/2018 | Final Potentially Liable Person Status Letter |
2017.07.18_Final PLP_USG Interiors_Market Place Auto | 7/18/2017 | Final Potentially Liable Person Status Letter |
2017.07.18_Final PLP_USG Interiors_Frohmader | 7/18/2017 | Final Potentially Liable Person Status Letter |
Preliminary Determination of Liability | 4/10/2017 | Early Notice Letter |
Preliminary Determination of Liability | 4/10/2017 | Early Notice Letter |
USG Interiors Inc Puyallup Agreed Order | 4/3/2008 | Agreed Order |
USG Interiors Inc Puyallup Order on Consent | 4/1/1987 | Administrative Order on Consent |
Outreach Information 6
Document Title | Document Date | Document Type |
USG Interiors Inc Puyallup Responsiveness Summary | 4/1/2019 | Responsiveness Summary |
USG Interiors, LLC Puyallup Site | 12/13/2018 | Fact Sheet\Public Notices |
Public Participation Plan USG Interiors LLC Puyallup, Washington | 12/13/2018 | Public Participation Plan |
USG Interiors Inc Puyallup Agreed Order for a Remedial Investigation and Feasibility Study Available | 4/1/2009 | Fact Sheet\Public Notices |
USG Interiors Inc Puyallup Responsiveness Summary | 6/1/2008 | Responsiveness Summary |
USG Interiors Inc Puyallup Public Participation Plan | 4/1/2008 | Public Participation Plan |
State Environmental Policy Act 2
Document Title | Document Date | Document Type |
SEPA Determination of Non Significance | 12/27/2018 | SEPA Documents |
SEPA Environmental Checklist | 4/11/2018 | SEPA Documents |
Technical Reports 10
Document Title | Document Date | Document Type |
USG Interiors, Inc - Notice of Proj Coordinator Designation | 4/9/2024 | Site Specific Administrative Document - other (Administrative correspondence) |
In Situ Solidification and Stabilization Pilot Study | 2/25/2022 | Site Specific Technical Document - other |
Final Work Plan for Geotechnical and Bench Scale Study | 9/29/2020 | Remedial Action Report |
Final Concenptual Site Model | 4/20/2020 | Performance/Confirmational Monitoring Plan or Report |
USG Interiors Inc. Puyallup - Satisfaction of Agreed Order DE5489 | 6/6/2019 | Site Specific Administrative Document - other (Administrative correspondence) |
Final Cleanup Action Plan | 4/19/2019 | Cleanup Action Plan |
Inadvertent Discovery Plan | 4/17/2019 | Cleanup Action Plan |
Draft Cleanup Action Plan, USG Interiors, Puyallup Site | 4/10/2014 | Cleanup Action Plan |
Feasibility Study USG Interiors Puyallup Site | 12/4/2013 | Feasibility Study |
USG Puyallup Remedial Investigation Report 2011 | 6/23/2011 | Remedial Investigation Report |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 1
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals Priority Pollutants | R | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated