Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation

 
Publication number Date Published
01-03-064January 2001
VIEW NOW Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation (Number of pages: 33) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Roberts, M.
Description Located in the South Puget Sound region, South Prairie Creek is a tributary to the Carbon River, which is a tributary to the Puyallup River. Lower South Prairie Creek exceeded water quality standards for fecal coliform bacteria, based on Ecology monitoring data from 1992-93, and a segment was placed on the 303(d) list. Upstream sections are listed for temperature, based on data collected by the Muckleshoot Tribe in 1997.

The purpose of the Total Maximum Daily Load (TMDL) is to determine contributors to the fecal coliform bacteria exceedences and to determine whether other nonpoint-source-related parameters meet water quality standards.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords creek, 303(d), evaluation, study, basin, river, plan, water, quality assurance, quality assurance project plan, assessment, quality, Total Maximum Daily Load, tribe, Puget Sound
WATERSHED Water Resource Inventory Area 10 Puyallup-White
RELATED PUBLICATIONS Title:

Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report

Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment