Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation

 
Publication number Date Published
10-10-014March 2010
VIEW NOW Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation (Number of pages: 9) (Publication Size: 236KB)




Trouble viewing? Try these free options.
Author(s) Betsy Dickes
Description The purpose of this Quality Assurance Project Plan (QAPP) Addendum 2 is to outline a plan for sampling that will assist in verifying that the bacteria source has been eliminated. Sampling procedures will be similar to the original QAPP (Roberts, 2001) and Addendum1 (Kardouni, 2009).

This addendum includes project background, goal and objectives, proposed project and sampling schedule and design, field and laboratory logistics, project organization, and literature references.

REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact Betsy Dickes at 360-407-6296
Keywords addendum, sampling, quality assurance project plan, Total Maximum Daily Load
RELATED PUBLICATIONS Title:

Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report

Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation