Title | Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation |
||||
|
|||||
VIEW NOW |
Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation (Number of pages: 9) (Publication Size: 236KB)
|
||||
Author(s) | Betsy Dickes | ||||
Description | The purpose of this Quality Assurance Project Plan (QAPP) Addendum 2 is to outline a plan for sampling that will assist in verifying that the bacteria source has been eliminated. Sampling procedures will be similar to the original QAPP (Roberts, 2001) and Addendum1 (Kardouni, 2009). This addendum includes project background, goal and objectives, proposed project and sampling schedule and design, field and laboratory logistics, project organization, and literature references. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Betsy Dickes at 360-407-6296 | ||||
Keywords | addendum, sampling, quality assurance project plan, Total Maximum Daily Load | ||||
RELATED PUBLICATIONS | Title:
Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.