Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study

 
Publication number Date Published
03-03-021June 2003
VIEW NOW South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study (Number of pages: 87) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Roberts, M.
Description South Prairie Creek, downstream of the town of South Prairie, and Spiketon Creek/Ditch, located southwest of Buckley, do not meet the fecal coliform bacteria Class A water quality standard, and reductions in bacteria loads are required. The mouth of Wilkeson Creek does meet the water quality standard and does not require bacteria reductions.

South Prairie Creek from the town of South Prairie downstream, Spiketon Creek/Ditch, and Wilkeson Creek exceed the numerical Class A temperature standard. A variety of management activities are necessary to meet the temperature standard under extreme hydrologic conditions.
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords creek, Flux, temperature, 303(d), study, river, plan, water, waste, Total Maximum Daily Load, tribe, fecal coliform, bacteria
WATERSHED Water Resource Inventory Area 10 Puyallup-White
DATA Environmental Information Management (EIM) #SPC TMDL

RELATED PUBLICATIONS Title:

Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan

South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report

Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation

Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment