Title | South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study |
||||
|
|||||
VIEW NOW |
South Prairie Creek Bacteria and Temperature Total Maximum Daily Load Study (Number of pages: 87) (Publication Size: 1MB)
|
||||
Author(s) | Roberts, M. | ||||
Description | South Prairie Creek, downstream of the town of South Prairie, and Spiketon Creek/Ditch, located southwest of Buckley, do not meet the fecal coliform bacteria Class A water quality standard, and reductions in bacteria loads are required. The mouth of Wilkeson Creek does meet the water quality standard and does not require bacteria reductions. South Prairie Creek from the town of South Prairie downstream, Spiketon Creek/Ditch, and Wilkeson Creek exceed the numerical Class A temperature standard. A variety of management activities are necessary to meet the temperature standard under extreme hydrologic conditions. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | creek, Flux, temperature, 303(d), study, river, plan, water, waste, Total Maximum Daily Load, tribe, fecal coliform, bacteria | ||||
WATERSHED | Water Resource Inventory Area 10 Puyallup-White | ||||
DATA | Environmental Information Management (EIM) #SPC TMDL |
||||
RELATED PUBLICATIONS | Title:
Addendum 2 to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan South Prairie Creek Bacteria and Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load, Phase 1 Assessment |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.