Title | American Plating Post-Interim-Action Groundwater Monitoring Results, March and August 2005 |
||||
|
|||||
VIEW NOW |
American Plating Post-Interim-Action Groundwater Monitoring Results, March and August 2005 (Number of pages: 18) (Publication Size: 206KB)
|
||||
Author(s) | Marti, P. | ||||
Description | During March and August 2005, groundwater samples for dissolved cadmium, chromium, copper, and nickel, WAD cyanide, and volatile organics were collected from the former American Plating site in Tacoma. Nickel did not meet (exceeded) the groundwater cleanup level of 8.2 ug/L in two wells at concentrations of 9.2 to 40.3 ug/L. Copper slightly exceeded the cleanup level of 3.1 ug/L in one well. Chromium concentrations ranged from 9 to 88 ug/L. Hexavalent chromium and WAD cyanide were not detected in any of the wells. Several volatile organics were detected in one well, but at concentrations near or below the reporting limit. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | toxics cleanup, samples, toxics, results, wells, waterway, cleanup, water, monitoring, groundwater, copper, chromium | ||||
WATERSHED | Water Resource Inventory Area 10 Puyallup-White | ||||
DATA | Environmental Information Management (EIM) #AMERPLAT |
||||
RELATED PUBLICATIONS | Title:
American Plating Post-Interim-Action Groundwater Monitoring Results: April and October, 2010 American Plating Post-Interim-Action Groundwater Monitoring Results: May and November, 2009 American Plating Post-Interim-Action Groundwater Monitoring Results: May and September, 2008 American Plating Post-Interim-Action Groundwater Monitoring Results, April and September, 2007 American Plating Post-Interim-Action Groundwater Monitoring Results, May and September, 2006 American Plating Post-Interim-Action Groundwater Monitoring Results, February and August 2004 Quality Assurance Project Plan: American Plating Post-Interim Action Monitoring |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.