Title | American Plating Post-Interim-Action Groundwater Monitoring Results, April and September, 2007 |
||||
|
|||||
VIEW NOW |
American Plating Post-Interim-Action Groundwater Monitoring Results, April and September, 2007 (Number of pages: 23) (Publication Size: 388KB)
|
||||
Author(s) | Marti, P. and T. Roberts | ||||
Description | Groundwater samples for dissolved metals and WAD cyanide were collected in April and September 2007 from the former American Plating site in Tacoma to provide post-interim action groundwater data. Dissolved cadmium, copper, and nickel were detected at concentrations below cleanup levels. Dissolved chromium concentrations peaked at 28 to 750 µg/L in April, then decreased to 28 to 84 µg/L in September. Dissolved hexavalent chromium was not detected. WAD cyanide concentrations exceeded the cleanup level of 1 µg/L in three wells, ranging from 7 to 13 µg/L. Due to damage in 2006, well MW-10, which had the highest nickel concentrations (29 to 62 ug/L), needs to be decommissioned. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | wells, water, toxic, groundwater, cadmium | ||||
WATERSHED | Water Resource Inventory Area 10 Puyallup-White | ||||
DATA | Environmental Information Management (EIM) #AMERPLAT |
||||
RELATED PUBLICATIONS | Title:
American Plating Post-Interim-Action Groundwater Monitoring Results: April and October, 2010 American Plating Post-Interim-Action Groundwater Monitoring Results: May and November, 2009 American Plating Post-Interim-Action Groundwater Monitoring Results: May and September, 2008 American Plating Post-Interim-Action Groundwater Monitoring Results, May and September, 2006 American Plating Post-Interim-Action Groundwater Monitoring Results, March and August 2005 American Plating Post-Interim-Action Groundwater Monitoring Results, February and August 2004 Quality Assurance Project Plan: American Plating Post-Interim Action Monitoring |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.